Installation and operating instructions for
Rail Clamp DR 085/088 FHM
spring activated
– hydraulically released
E 09.797e
Issue: 14.09.2022
Version: 2
Drawn: BAHS
Checked: OHLM
Pages: 39
Page: 29
Information!
We recommend MOLYSLIP copper grease
After greasing has been done, the rail clamp assembly must tilt freely by pushing one of the
levers.
2. Check roller position by ensuring that the convex contact face of the rollers supporting in the
flat area of the rail.
Fig. 4.4
3. Pad gap and pads condition
14
. diamond-tipped not dull.
4. Proceed to pad gap adjustment as per chapter 2.7.
5.
Check the condition of the actuator’s
15
dust seal.
4.2 Maintenance level 2
- Perform level 1 maintenance.
- Check gap pads (see chapter 2.7).
- Replacing oil of hydraulic pack
4.3 Maintenance level 3
- Perform level 1 and level 2 maintenance.
- Replacing Spring washers. (Consult RINGSPANN maintenance service)
- Replacing seals. (Consult RINGSPANN maintenance service)
- Replacing Pads + rollers. (Consult RINGSPANN maintenance service)
Flat area
of the rail