
12
AIR REGULATOR INSTALLATION AND OPERATION
1. Firmly tight and seal the copper air hole at IN and OUT terminal by high pressure rubber tube firmly.
2. Tight and seal the meter with meter face rubber tube.
3. Fix the sheet holder with screw as the regulator position.
4. Get down the plastic screw and fix the regulator on the shelf.
5. Turn on the air valve, turn up the pressure adjusting knob, Turn the pressure to rated volume (meter
inside shows Kgf/cm
2
)), and then put down the knob. (+ means increasing pressure, - means
decreasing pressure.)
6. Scale of the meter is as follow. The volume in the picture is 6kg.
7. If the water in the gas filtering bottle is too much, please turn on the water valve to let the water go
out.
Regulator installation
1
Pressure adjustment knob
2
Sheet holder
3
Copper air mouth
4
Pressure meter
5
Air filtering bottle
6
Drain knob
7
Air in
8
Air out
9
Pressure meter face
Содержание CUT 100GT
Страница 1: ...CUT 100GT PLASMA CUTTING MACHINE USER MANUAL...
Страница 20: ...CIRCUIT DIAGRAM...