8
3−3.
Start-up procedure
Hold pressing power switch for 5 seconds and the power will turn on. Via battery check,
filter probe connection check and sensor connection check, the gas detection will start.
The sequence performance until the gas detection starts is as follows :
Hold pressing power switch for 5 seconds
↓
100.0vol% 25.0%
At pump connection fail.
Approx. 5 sec.
↓
①
BATT.
:E −−−|−− F
At battery power shortage.
Approx. 5 sec.
↓
②
PREPARATION
Approx. 5 sec.
↓
PROBE/FILTER OK?
After checking tube/filter, press
ENTER
.
↓
SENSOR CHECK
At sensor connection fail.
Approx. 5 sec.
↓
③
SENSOR CHECK OK
Approx. 5 sec.
↓
WARMING UP 30sec
30 sec.
↓
Countdown
STAND BY OK
Approx. 5 sec.
↓
0.0%LEL 20.9%
Detection starts.
①
Display, performance at pump connection failure. (See 3.)
FAIL PUMP
(
Lamp : Light-on, Buzzer : Continuous
)
②
Display, performance at power voltage shortage. (See 3. and 5-1)
REPLACE BATTERY
(
Lamp : Light-on, Buzzer : Continuous
)
③
Display, performance at sensor connection failure. (See 3.)
In case of HC sensor connection failure
FAIL SENSOR HC
(
Lamp : Light-on, Buzzer : Continuous
)
In case of O2 sensor connection failure
FAIL SENSOR O2
(
Lamp : Light-on, Buzzer : Continuous
)
In case of HC sensor/O2 sensor connection failure
FAIL SENSOR
(
Lamp : Light-on, Buzzer : Continuous
)
*
Note
At power on, check that
the buzzer and pump
sound.