TECHNICAL ASSISTANCE SERVICE
37
It is essential to perform the following checks before star-
ting up or testing the functioning of
r g
boiler.
In particular:
- Check that the fuel shut-off cock and heating system
shut-off cock are open
- Check that the water pressure gauge shows a pressure
over 1 bar
with the system cold. Check also that the
water circuit is properly de-aerated
- Check that the expansion vessel is correctly pre-charged
- Check that the electrical connections have been made
correctly
- Check that the flue gas exhaust and stack have been
correctly installed and connected.
20
40
60
80
100
0
120
Once you have completed all the preparatory steps,
proceed as follows to start up the boiler for the first time:
- Set the room thermostat to the required temperature
(~20 °C) or, if the system has a timer, make sure that
this is switched “On” and adjusted to the required tem-
perature (~20 °C)
- Turn the system's main power switch ON
- Adjust the boiler thermostat to about the middle of the
section with three lines.
ONLY FOR
g
NK MODELS
- Adjust the boiler and storage cylinder thermostats to
about the middle of the section with three lines
- Turn the Summer/Winter selector to (
II
) Winter.
20
40
60
80
100
0
120
20
40 60 80
100
4
3 2 1
0
0
120
PREPARING FOR FIRST START-UP
0
2 3
5
6
4
1
INITIAL START-UP
Содержание Tregi 3/100 NK
Страница 1: ...INSTALLATION USER OPERATION MAINTENANCE AND SYSTEM MANAGEMENT MANUAL CAST IRON BOILERS g N g NK...
Страница 46: ...46...
Страница 47: ......