background image

INSTALLER

25

g

 N - NK

 boilers from size 

5

 to 

10

 must be installed 

in dedicated boiler rooms.
The boiler room must have adequately sized vents, and 
must comply with applicable laws and standards.

When installing the boiler, allow sufficient space 
around it to access all safety and control devices 
and to permit easy maintenance.

If the specific weight of the gas supply to the bur-
ner is greater than the specific weight of air, install 
all electrical parts at least 500 mm above floor level.

Do not install the boiler outdoors. It is not designed 
to work outdoors and is not fitted with the necessa-
ry automatic anti-frost systems to do so.

g

 N

 boilers are designed and made for use in central heating installations, but can also be used for domestic hot 

water production if connected to suitable systems. Water fittings are as specified in the following table:

When installing these boilers in old systems or systems 
requiring modernisation, always perform the following 
checks:
- Make sure that the stack is able to withstand the tem-

perature of the combustion gases and that it has been 
designed and made in compliance with applicable 
standards. The stack must also be as straight as possi-
ble, sealed, insulated and not blocked or choked.

- Make sure that the electrical system has been installed 

by a qualified electrician in compliance with applicable 
standards.

- Make sure that the oil feed line and any oil storage 

cylinder are made and installed in compliance with 
applicable standards.

-  Make sure that the expansion vessels are big enough to 

contain the volume generated by thermal expansion.

- Make sure that flow rate, head and direction of flow of 

the pumps are suitable and correct.

-  Make sure that the circuit has been flushed out to remo-

ve all sludge and lime scale, and has been vented and 
seal tested.

- Make sure that a suitable water treatment system is 

installed if the quality of the supply/recirculation water 
so demands. (See page 28.)

3 ÷ 8 N

9 - 10 N

DESCRIPTION

MODEL 

N

3

4

5

6

7

8

9

10

A

225

mm

B

117

65

mm

C

530

815

mm

MI (CH flow)

1"1/4 F

1"1/2 F

Ø

RI (CH return)

1"1/4 F

1"1/2 F

Ø

MI

RI

MI

RI

A

A

B

C

A

B

A

C

PLACE OF INSTALLATION

INSTALLATION IN OLDER SYSTEMS AND SYSTEMS REQUIRING MODERNISATION

WATER CONNECTIONS

Rear view

Rear view

Содержание Tregi 3/100 NK

Страница 1: ...INSTALLATION USER OPERATION MAINTENANCE AND SYSTEM MANAGEMENT MANUAL CAST IRON BOILERS g N g NK...

Страница 2: ...ctions of the Electromagnetic Compatibility Directive 2004 108 CE and Low Voltage Directive 2006 95 CE 0694 MODEL CODE g 3 N 4040719 g 4 N 4040720 g 5 N 4040721 g 6 N 4040722 g 7 N 4040723 g 8 N 40407...

Страница 3: ...rised r Technical Assistance Centre Their personnel are specially trained to keep your boiler efficient and cheap to run Technical Assistance Centres also stock any original spare parts that might be...

Страница 4: ...ion in older systems and systems requiring modernisation 25 Water connections 25 Fitting the casing panels 29 Wiring 31 Combustion gas exhaust 34 Filling and emptying the system 35 TECHNICAL ASSISTANC...

Страница 5: ...ected In particular bThe boiler is delivered in a single crate Check that the appliance is complete and undamaged as soon as you receive it Report any discrepancies or damage to the r dealer who sold...

Страница 6: ...ened completely to facilitate the inspection maintenance and cleaning of internal parts and to speed up servicing in general If equipped with an optional total shutdown control card r g boilers can im...

Страница 7: ...Automatic vent valve 3 Non return valve 4 Storage cylinder pump 5 Storage cylinder drain cock 6 Boiler sensor socket 7 Burner 8 CH drain cock 9 Storage cylinder 100 l 10 Boiler body 11 Casing 12 Dome...

Страница 8: ...4 Boiler sensor socket 5 Burner 6 CH drain cock 7 Storage cylinder 60 l 8 Automatic vent valve 9 Storage cylinder pump 10 Boiler body 11 Casing 12 Domestic hot water outlet 13 Magnesium anode 14 Stora...

Страница 9: ...thermostat Allows you to set the temperature of the central heating water 4 Electrical power indicator green Lights to show that the boiler is receiving electrical power 5 Burner lockout indicator red...

Страница 10: ...indicator green Lights to show that the boiler is receiving electrical power 5 Burner lockout indicator red Lights to show that the burner lockout has tripped 6 Summer I Winter II selector 7 Storage c...

Страница 11: ...ner lockout indicator TS Safety thermostat 110 C 0 6 TR Boiler control thermostat 33 82 C 3 FU Mains power fuse 6 3 A T CO1 CO1A Multi connectors MO1 Terminal strip MB 7 pin burner connector PI Centra...

Страница 12: ...kout indicator LV Mains power indicator CO1 CO1A Multi connectors CO2 CO2A Multi connectors MO1 Terminal strip MB 7 pin burner connector TB Storage cylinder thermostat 0 70 C 3 TL1 Maximum temperature...

Страница 13: ...ecks Make sure that the performance of the old burner is adequate for the requirements of the boiler Make sure that the length and diameter of the bur ner s blast tube are suitable for the boiler s co...

Страница 14: ...Pilade Riello 7 37045 Legnago VR ITALY T067676GE Mod Cod N Qn max kW Pn max kW bar Pms RIELLO S p A Via Ing Pilade Riello 7 37045 Legnago VR ITALY PAESE DI DESTINAZIONE PAYS DE DESTINATION BESTIMMUNG...

Страница 15: ...3 1 2 1 0 0 9 0 78 0 70 Flue gas temperature T 140 196 202 C Maximum flue gas flow rate gas oil 0 010 0 013 0 017 0 020 0 024 0 027 0 033 0 037 Kg s Furnace pressure Minimum 0 03 0 12 0 17 0 26 0 33 0...

Страница 16: ...55 63 22 31 dm3 Total surface area for heat exchange 0 93 1 30 1 67 2 04 2 41 2 78 0 93 1 30 m2 Volumetric heat load 1656 1582 1582 1562 1550 1522 1656 1582 kW m3 Specific heat load 25 7 24 2 24 1 23...

Страница 17: ...heating circuit is over 1 bar but below the maximum limit specified for the boiler If this is not the case contact r s Technical Assistance Service Set the room thermostat to the required temperature...

Страница 18: ...of the flame If you are going to be away for a short period of time like a weekend or a short holiday etc and outdoor tempera tures are above ZERO proceed as follows Turn the function selector to OFF...

Страница 19: ...ve procedure 20 40 60 80 100 0 120 Use a cloth damped in soapy water to clean the boiler s external casing To remove stubborn marks use a cloth damped in a 50 mix of water and denatured alcohol or a s...

Страница 20: ...EL UNDERTAKE PERIODIC MAINTENANCE AND COMBUSTION EFFICIENCY MEASUREMENTS r s Technical Assistance Service is qualified to satisfy these legal requirements and can also provide useful information on MA...

Страница 21: ...ered in 3 boxes on a single pallet and are further protected by a nylon film 1 The BOILER BODY box to which the documentation envelope A is attached also contains Instruction manual Warranty certifica...

Страница 22: ...C OVERALL DIMENSIONS AND WEIGHTS DESCRIPTION MODEL g N 3 4 5 6 7 8 9 10 A Width 450 mm B Height 850 965 mm C Overall depth 490 590 690 790 890 990 995 1095 mm D Depth 460 560 660 760 860 960 mm E 290...

Страница 23: ...ION MODEL g NK 3 100 4 100 5 100 6 100 7 100 8 100 3 60 4 60 A Width 600 450 mm B Height 1470 1510 1470 mm C Overall depth 580 690 790 890 990 580 mm D Depth 550 660 760 860 960 550 mm E 290 mm Net we...

Страница 24: ...two 3 4 diameter pipes 1 through the lifting holes 2 in the boiler body bWear suitable personal protective equipment and use suitable safety devices aDo not dispose of packaging material into the envi...

Страница 25: ...nd the tem perature of the combustion gases and that it has been designed and made in compliance with applicable standards The stack must also be as straight as possi ble sealed insulated and not bloc...

Страница 26: ...67 189 mm MI CH flow 1 1 4 F RI CH return 1 1 4 F US DHW outlet 3 4 M RC DHW recirculation 3 4 F ES domestic cold water inlet 3 4 M ES RC US MI RI g 60 NK A A B C D E F IMPORTANT To avoid damage to th...

Страница 27: ...production g NK bThe domestic hot water circuit must include an expansion vessel of adequate capacity as well as a safety valve max 6 bar connected directly to the storage cylinder HEATING RETURN HEA...

Страница 28: ...filled with anti freeze must be fitted with water disconnectors bIf needed water supplies and recovery circuits must be conditioned by suitable treatment systems See the table for applicable referenc...

Страница 29: ...sive aluminium foil tape 4 supplied with the casing Remove the top nut 5 from the storage cylinder flan ge and fit the casing support bracket 6 Replace the nut 5 on the flange but do not tighten yet F...

Страница 30: ...nto the shorter sensor holder and the TB storage cylinder thermostat 2 into the longer sensor holder Take care to push the sensors all the way into their sockets The socket for the TB thermostat senso...

Страница 31: ...ntrol panel see the diagram on pages 11 12 This must be done by the heating engineer or a qualified electrician Proceed as follows to access the control panel terminal strip Remove the front and top p...

Страница 32: ...trip 6 7 8 9 10 11 L1 PE TA TA 1 2 3 4 5 N L1 PE TA TA 1 2 3 4 5 N L1 PE N TA TA L1 PE 1 2 3 N PI 230V 50Hz E PB 1 2 3 L1 Live N Neutral PE Earth ground TA Room thermostat PI Central heating pump not...

Страница 33: ...f the casing through the slot 1 On completion of the electrical connections replace all removed components in the opposite order aIt is strictly forbidden to use fuel and or water pipes to ground the...

Страница 34: ...cal standards assu ming zero pressure at the connection to the flue gas exhaust bInadequate or badly dimensioned stacks and exhausts can increase combustion noise cause condensation problems and affec...

Страница 35: ...cilitate filling the slot in the screw must be perpendicular to the direc tion of flow Open the shut off cocks for the water circuit Slowly fill the system to a cold pressure of 1 5 bar Close all prev...

Страница 36: ...lose the shut off cocks for the water circuit Connect plastic hoses 5 to the hose unions on the boiler drain cock 1 and or storage cylinder drain cock 2 NK models NOTE Open the non return valve 3 to f...

Страница 37: ...een correctly installed and connected 20 40 60 80 100 0 120 Once you have completed all the preparatory steps proceed as follows to start up the boiler for the first time Set the room thermostat to th...

Страница 38: ...about 30 seconds before resetting the burner To reset the burner press the red button light on the burner The complete ignition cycle will be repeated up to the ignition of the flame bNo warning signa...

Страница 39: ...from position II to I and back The room thermostat or timer setting is changed Make sure that the pump is free and rotates in the right direction Turn the main power switch OFF and make sure that the...

Страница 40: ...e going to be away for a short period of time like a weekend or a short holiday etc and outdoor tempera tures are above ZERO proceed as follows Turn the function selector to OFF I and make sure that t...

Страница 41: ...ce keeps con sumption and emissions down and ensures that the boiler continues to operate reliably over time Have your boiler serviced either by r s Technical Assistance Service or by a qualified heat...

Страница 42: ...oth damped in a 50 mix of water and denatured alcohol or a suitable cleaning product Carefully dry the boiler after cleaning aDo not use abrasive products petrol or triethylene Internal Proceed as fol...

Страница 43: ...flange 5 in place and remove the flange Clean inside the domestic hot water cylinder and remove any residues through the access hole Check the magnesium anode 6 for wear and replace it if necessary Ch...

Страница 44: ...The boiler does not reach its temperature setpoint Control thermostat problem No water supply Air in the circuit Check the circuit pressure Check the vent valve The boiler enters temperature safety l...

Страница 45: ...blem Check the efficiency of the expansion vessel The storage cylinder safety valve keeps opening DHW pump problem Check unseize the pump Check the electrical connection between the pump and the contr...

Страница 46: ...46...

Страница 47: ......

Страница 48: ...el 0442630111 Fax 0442630371 www riello it As part of the company s ongoing commitment to perfecting its range of products the appearance dimensions technical data equipment and accessories may be sub...

Отзывы: