INSTALLER
32
- Route the power cable (E) through the cable clamp (F)
and fix it in place
- Access the terminal strip (G).
- Make the electrical connections as shown in the fol-
lowing diagrams
G
F
E
G
Connections to be made by the heating engineer – control panel terminal strip
6
7
8
9
10
11
L1
PE TA TA
1
2
3
4
5
N
L1
PE TA TA
1
2
3
4
5
N
L1
PE
N
TA TA
L1
PE
1
2
3
N
PI
230V 50Hz
E
PB
1
2
3
L1 Live
N Neutral
PE Earth/ground
TA Room thermostat
PI Central heating pump (not supplied)
PB Storage cylinder pump
b
The jumper (TA-TA) must be removed from
the terminal strip E in order to connect up
the room thermostat
6
7
8
9
10
11
L1
PE TA TA
1
2
3
4
5
N
L1
PE TA TA
1
2
3
4
5
N
L1
PE
N
TA TA
L1
PE
1
2
3
N
PI
230V 50Hz
E
g
NK
g
N
MO1
MO1
Содержание Tregi 3/100 NK
Страница 1: ...INSTALLATION USER OPERATION MAINTENANCE AND SYSTEM MANAGEMENT MANUAL CAST IRON BOILERS g N g NK...
Страница 46: ...46...
Страница 47: ......