3
This manual, Code Doc-0053772 - Rev. 39 (04/2018)
comprises 40 pages.
Contents
CONTENTS
The following symbols are used in this manual:
9
CAUTION! =
Identifies actions that require caution and
adequate preparation.
0
STOP! =
Identifies actions that you MUST NOT do.
This manual, Code
- Rev.
comprises
pages.
1 GENERAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
General Safety Information . . . . . . . . . . . . . . . . . . . . . . 4
Important safety precautions . . . . . . . . . . . . . . . . . . . . 4
Description of the appliance . . . . . . . . . . . . . . . . . . . . . 5
Control panels. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Recommended burners and technical specifications . . 7
1.5.1 TAU N NB with power < 400 kW . . . . . . . . . . . . . . . . . . . 7
1.5.2 TAU N PREMIX with power <400 kW . . . . . . . . . . . . . . . . 9
1.5.3 TAU N with power >400 kW. . . . . . . . . . . . . . . . . . . . . .11
Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
2 SYSTEM MANAGER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14
Putting into service . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Preparing for extended periods of disuse . . . . . . . . . . 15
2.3 Cleaning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
2.4 Maintenance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Useful information . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
3 INSTALLER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17
Unpacking the product . . . . . . . . . . . . . . . . . . . . . . . . .17
Overall dimensions and weights . . . . . . . . . . . . . . . . . 18
3.3 Handling. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Installation premises . . . . . . . . . . . . . . . . . . . . . . . . . 19
Water in central heating systems. . . . . . . . . . . . . . . . . 20
Water connections . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Condensate evacuation. . . . . . . . . . . . . . . . . . . . . . . . 25
Neutralising the condensate . . . . . . . . . . . . . . . . . . . . 25
Discharge of combustion products . . . . . . . . . . . . . . . 27
Installation in B23P configuration . . . . . . . . . . . . . . . . 27
Door hinges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Changing the direction of door opening . . . . . . . . . . . 28
Removing the hinge assembly "B" . . . . . . . . . . . . . . . 30
Earth connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
Fitting the casing panels. . . . . . . . . . . . . . . . . . . . . . . 31
4 TECHNICAL ASSISTANCE SERVICE . . . . . . . . . . . . . . . . . .32
Preparing for initial startup. . . . . . . . . . . . . . . . . . . . . 32
Initial startup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
Checks during and after initial start-up . . . . . . . . . . . 33
4.4 Maintenance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
Cleaning the boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
4.6 Troubleshooting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36