17
INSTALLER
INSTALLER
3
INSTALLER
3.1
Unpacking the product
The
TAU N
boiler is supplied in two separate packages.
1 BOILER BODY CRATE
to which is attached the documentation
envelope (A) containing:
− Instruction manual
− Data label (to be applied to the panelling on completion
of the installation)
− Hydraulic test certificate
− Bar code labels
− Ceramic insulation (B)
− Cleaning brush (C).
9
The instruction manuals are an integral part of the boiler,
therefore we recommend to read and keep them with care.
A
C
B
2 PANELLING CRATE
, complete with assembly accessories, pro-
tected by cardboard packaging and a wooden crate.
9
For the boiler to function correctly, it must be connected to a
R
control panel and dedicated control accessories.
Installer