21
ENGLISH
• Use an omnipolar magnetothermic switch, feeder disconnec-
tor, compliant with CEI-EN 60335-1 standards (contact open-
ing of at least 3.5mm, category 3)
• use cables with a section
≥
1.5mm
2
and comply with the con-
nection L (phase) - N (Neutral)
• The switch amperage must be adapted to the electric output
of the boiler, refer to technical data to check the electric output
of the model installed
• connect the appliance to an effective grounding system
• safeguard access to the power socket after the installation
0
It is forbidden to use gas and water pipes for grounding the unit.
9
The manufacturer is not liable for any damage caused by failure
to comply with the wiring diagrams.
9
The installer is responsible for ensuring the appliance is suitably
earthed; the manufacturer will not be liable for any damage re-
sulting from an incorrect or absent earth connection.
2.8 - Boiler configuration
The electronic board has a number of jumpers (JPX) that allow to
configure the boiler.
To access the board, proceed as follows:
• Turn the main system switch OFF.
• Unscrew the housing fixing screws (A - fig. 9).
• Move the housing base forwards and then upwards to unhook it
from the frame.
• Unscrew the instrument panel fixing screws (B - fig. 10).
• Turn the instrument panel forward.
• Unscrew the fixing screws (C - fig. 11) to access the terminal
board.
Jumper JP7 (fig. 12)
Pre-selection of the most appropriate heating temperature adjust-
ment field based on the type of system.
• Jumper not inserted: Standard system (40-80 °C).
• Jumper inserted: Floor installation (20-45°C).
During manufacture, the boiler is configured for standard systems.
Jumper
Description
JP1
Calibration
JP2
Heating timer reset
JP3
Calibration (see paragraph “Adjustments”)
JP4
Do not use
JP5
Heating only function with a predisposition for external
storage tank with thermostat (JP8 inserted) or probe
(JP8 not inserted)
JP6
Enable night-time compensation and continuous pump
function (only with outdoor probe connected)
JP7
Enable standard system/low temperature management
(see above)
JP8
Management of external boiler with thermostat enabled
(jumper inserted)/ Management of external boiler with
probe enabled (jumper not inserted)
The boiler foresees jumpers JP5 and JP8 inserted as standard
(heating only version arranged for storage tank with thermostat); if
the use of an exterior storage tank with probe is required, jumper
JP8 must be removed.
2.9 - Gas connection
The connection of the
START CONDENS IS
boiler to the gas supply
must be carried out in the respect of current installation standards.
Before carrying out the connection, it is necessary to ensure that:
• The gas type is suitable for the appliance
• The piping is thoroughly clean.
9
The gas feeding system must be adapted to the boiler output
and must be equipped with all the safety and control devices pre-
scribed by the current standards. The use of a filter of adequate
dimensions is recommended.
9
Once the installation is done, check that the junctions carried
out are sealed.
2.10 - flue gas outlet and combustion air suction
67,5
135
72
130,5
130
175
Suction/discharge pipes length table
Maximum straight
length
Pressure drop
25 IS
bend 45° bend 90°
Flue gases pipe
Ø 80 mm ("forced open”
installation) (type B23P-
B53P)
70m
1m
1.5m
Concentric pipe
Ø 60-100 mm (horizontal)
5.85m
1.3m
1.6m
Concentric pipe
Ø 60-100 mm (vertical)
6.85m
1.3m
1.6m
Concentric pipe
Ø 80-125 mm
15.3m
1m
1.5m
Twin pipe Ø 80 mm
45+45 m
1m
1.5m
9
"Straight length" means without bends, drainage terminals or
joints.
9
It is compulsory to use specific pipes.
9
The non insulated flue gas outlet pipes are potential sources of
danger.
9
The use of a longer pipe causes a loss of output of the boiler.
9
Make sure the flue gas discharge pipe is tilted 3° towards the
boiler.
3°
Flue gases pipe Ø 80 mm ("forced open” installation) (type
B23P-B53P)
262,5
The appropriate adaptor kit must be installed for this configuration.
The concentric pipes can be fitted in most suitable direction in rela-
tion to installation requirements. For installation, follow the instruc-
tions supplied with the specific kit for condensing boilers.
Concentric pipes ø 60-100mm
130
100