(1*/,6+
7
the earth and connect it to the L and similarly connect the
remaining wiring to the N.
9
The earth conductor must be a couple of cm longer than the
others.
9
The boiler can operate with a phase-neutral or phase-phase
supply.
9
Mandatory items:
-
use an omnipolar magnetothermic switch, feeder
disconnector, compliant with CEI-EN 60335-1 standards
(contact opening of at least 3.5mm, category 3)
- use cables with a section
1.5mm
2
and comply with the
connection L (phase) - N (Neutral)
- the switch amperage must be adapted to the electric output
of the boiler, refer to technical data to check the electric
output of the model installed
- connect the appliance to an effective grounding system
- safeguard access to the power socket after the installation
0
It is forbidden to use gas and water pipes for grounding the
unit.
9
The manufacturer is not liable for any damage caused by
failure to comply with the wiring diagrams.
9
The installer is responsible for ensuring the appliance is
suitably earthed; the manufacturer will not be liable for any
damage resulting from an incorrect or absent earth connection.
%RLOHUFRQILJXUDWLRQ
The electronic board has a number of jumpers (JPX) that allow to
configure the boiler.
To access the board, proceed as follows:
- set the main system switch to OFF
- loosen the screws (
%
) that hold the housing in place (fig. 12)
- move the base of the shell forward and then upwards in order to
free it from the frame (fig. 13)
- turn the instrument panel forward
- unscrew the two screws of the small cover on the electronic
board to have access to the terminals (fig. 14).
-803(5 -3
: pre-selection of the most appropriate heating
temperature adjustment field based on the type of system.
-XPSHUQRWLQVHUWHGVWDQGDUGV\VWHP
standard system 40-80 °C
-XPSHULQVHUWHGIORRUV\VWHP
: floor installation 20-45°C.
During manufacture, the boiler is configured for standard systems
(fig. 15).
JP1
Calibration (Range Rated)
JP2
Heating timer reset
JP3
Calibration (see paragraph “Adjustments”)
JP4
Jumper on. Do not modify.
JP5
Jumper on. Do not modify.
JP6
Enable night-time compensation and continuous pump
function (only with outdoor probe connected)
JP7
Enable standard system/low temperature
management (see above)
JP8
No jumper. Do not modify.
*DVFRQQHFWLRQ
The connection of the
6WDUW$TXD&RQGHQV%,6
boiler to the gas
supply must be carried out in compliance with current installation
standards.
Before carrying out the connection, it is necessary to ensure that:
- the gas type is suitable for the appliance
- the piping is thoroughly clean.
9
The gas feeding system must be adapted to the boiler output
and must be equipped with all the safety and control devices
prescribed by the current standards. the use of a
¿
lter of
adequate dimensions is recommended.
9
Once the installation is done, check that the junctions carried
out are sealed.
)OXH JDV RXWOHW DQG FRPEXVWLRQ DLU VXFWLRQ ILJ
The
6WDUW$TXD &RQGHQV %,6
boiler must be equipped with
adequate flue gas outlet and air suction pipes according to the
type of installation, to be chosen from those indicated in the Riello
catalogue.
9
For the maximum lengths of the ducts refer to
À
ue systems
available in the catalogue.
9
The straight length measurement is inclusive of the
¿
rst bend
(boiler connection), terminals and joints; with the exception
of the vertical coaxial duct Ø 60-100 mm, where the straight
length does not include the bends.
9
7<3(%3%3,167$//$7,21
)OXHJDVGLVFKDUJHSLSH¡PP
The flue gas outlet pipe can be directed to the most suitable
direction according to installation requirements.
For installation, follow the instructions supplied with the kit.
In this configuration, the boiler is connected to the flue gas outlet
pipe of ø 80 mm through an adaptor of ø 60-80 mm.
9
In this case, the combustion air is picked up from the boiler
installation room (which must be a suitable technical room
with proper ventilation).
9
The non insulated
À
ue gas outlet pipes are potential sources
of danger.
9
Make sure the
À
ue gas discharge pipe is tilted 3° towards the
boiler.
PD[LPXPOHQJWKRIWKHIOXHJDV
GLVFKDUJHSLSH¡PP
SUHVVXUHGURS
FXUYHFXUYH
60 m
1 m
1,5m
9
"Straight length" means without bends, drainage terminals or
joints.
³$,57,*+7´,167$//$7,217<3(&
The boiler must be connected to concentric or twin flue gas
discharge pipes and air suction pipes, both leading outdoors. The
boiler must not be operated without them.
&RQFHQWULFSLSHV¡PP
The concentric pipes can be fitted in most suitable direction in
relation to installation requirements.
9
It is compulsory to use speci
¿
c pipes (see Riello catalogue).
9
Make sure the
À
ue gas discharge pipe is tilted 3° towards the
boiler.
9
Non-insulated outlet pipes are potential sources of danger.
9
The boiler automatically adapts ventilation according to the
type of installation and the length of the duct. Do not obstruct
or choke the combustion air suction pipe in any way.
+25,=217$/
VWUDLJKWOHQJWKRIFRQFHQWULF
SLSHPP
SUHVVXUHGURS
FXUYHFXUYH
7,85 m
1,3m
1,6m
9(57,&$/
VWUDLJKWOHQJWKRIFRQFHQWULF
SLSHPP
SUHVVXUHGURS
FXUYHFXUYH
8,85 m
1,3m
1,6m
For installation, follow the instructions supplied with the speci
¿
c