the earth and connect it to the L and similarly connect the 
remaining wiring to the N.

 

9

The earth conductor must be a couple of cm longer than the 
others.

 

9

The boiler can operate with a phase-neutral or phase-phase 
supply. 

 

9

Mandatory items:

use an omnipolar magnetothermic switch, feeder 
disconnector, compliant with CEI-EN 60335-1 standards 
(contact opening of at least 3.5mm, category 3)

-  use cables with a section 

•

 1.5mm

2

 and comply with the 

connection L (phase) - N (Neutral)

-  the switch amperage must be adapted to the electric output 

of the boiler, refer to technical data to check the electric 
output of the model installed

-  connect the appliance to an effective grounding system
-  safeguard access to the power socket after the installation

 

0

It is forbidden to use gas and water pipes for grounding the 
unit.

 

9

The manufacturer is not liable for any damage caused by 
failure to comply with the wiring diagrams.

 

9

The installer is responsible for ensuring the appliance is 
suitably earthed; the manufacturer will not be liable for any 
damage resulting from an incorrect or absent earth connection.

 %RLOHUFRQILJXUDWLRQ

The electronic board has a number of jumpers (JPX) that allow to 
configure the boiler.

To access the board, proceed as follows:
-  set the main system switch to OFF
-  loosen the screws (

%

) that hold the housing in place (fig. 12)

-  move the base of the shell forward and then upwards in order to 

free it from the frame (fig. 13)

-  turn the instrument panel forward
-  unscrew the two screws of the small cover on the electronic 

board to have access to the terminals (fig. 14).

-803(5 -3

: pre-selection of the most appropriate heating 

temperature adjustment field based on the type of system.

-XPSHUQRWLQVHUWHGVWDQGDUGV\VWHP

 standard system 40-80 °C

-XPSHULQVHUWHGIORRUV\VWHP

: floor installation 20-45°C.

During manufacture, the boiler is configured for standard systems 
(fig. 15).

JP1

Calibration (Range Rated)

JP2

Heating timer reset

JP3

Calibration (see paragraph “Adjustments”)

JP4

Jumper on. Do not modify.

JP5

Jumper on. Do not modify.

JP6

Enable night-time compensation and continuous pump 
function (only with outdoor probe connected)

JP7

Enable standard system/low temperature 
management (see above)

JP8

No jumper. Do not modify.

 *DVFRQQHFWLRQ

The connection of the 

6WDUW$TXD&RQGHQV%,6

 boiler to the gas 

supply must be carried out in compliance with current installation 
standards.
Before carrying out the connection, it is necessary to ensure that:
-  the gas type is suitable for the appliance
-  the piping is thoroughly clean.

 

9

The gas feeding system must be adapted to the boiler output 
and must be equipped with all the safety and control devices 
prescribed by the current standards. the use of a 

¿

 lter  of 

adequate dimensions is recommended.

 

9

Once the installation is done, check that the junctions carried 
out are sealed.

 )OXH JDV RXWOHW DQG FRPEXVWLRQ DLU VXFWLRQ ILJ

The 

6WDUW$TXD &RQGHQV  %,6

boiler must be equipped with 

adequate flue gas outlet and air suction pipes according to the 
type of installation, to be chosen from those indicated in the Riello 
catalogue.

 

9

For the maximum lengths of the ducts refer to 

À

 ue  systems 

available in the catalogue.

 

9

The straight length measurement is inclusive of the 

¿

 rst bend 

(boiler connection), terminals and joints; with the exception 
of the vertical coaxial duct Ø 60-100 mm, where the straight 
length does not include the bends.

 

9

7<3(%3%3,167$//$7,21
)OXHJDVGLVFKDUJHSLSH¡PP

The flue gas outlet pipe can be directed to the most suitable 
direction according to installation requirements.
For installation, follow the instructions supplied with the kit. 
In this configuration, the boiler is connected to the flue gas outlet 
pipe of ø 80 mm through an adaptor of ø 60-80 mm.

 

9

In this case, the combustion air is picked up from the boiler 
installation room (which must be a suitable technical room 
with proper ventilation).

 

9

The non insulated 

À

 ue gas outlet pipes are potential sources 

of danger.

 

9

Make sure the 

À

 ue gas discharge pipe is tilted 3° towards the 

boiler.

PD[LPXPOHQJWKRIWKHIOXHJDV

GLVFKDUJHSLSH¡PP

SUHVVXUHGURS

ƒFXUYHƒFXUYH

60 m

1 m

1,5m

 

9

"Straight length" means without bends, drainage terminals or 
joints.

³$,57,*+7´,167$//$7,217<3(&

The boiler must be connected to concentric or twin flue gas 
discharge pipes and air suction pipes, both leading outdoors. The 
boiler must not be operated without them.

&RQFHQWULFSLSHV¡PP

The concentric pipes can be fitted in most suitable direction in 
relation to installation requirements.

 

9

It is compulsory to use speci

¿

 c pipes (see Riello catalogue).

 

9

Make sure the 

À

 ue gas discharge pipe is tilted 3° towards the 

boiler.

 

9

Non-insulated outlet pipes are potential sources of danger.

 

9

The boiler automatically adapts ventilation according to the 
type of installation and the length of the duct. Do not obstruct 
or choke the combustion air suction pipe in any way.

+25,=217$/

VWUDLJKWOHQJWKRIFRQFHQWULF

SLSH‘PP

SUHVVXUHGURS

ƒFXUYHƒFXUYH

7,85 m

1,3m

1,6m

9(57,&$/

VWUDLJKWOHQJWKRIFRQFHQWULF

SLSH‘PP

SUHVVXUHGURS

ƒFXUYHƒFXUYH

8,85 m

1,3m

1,6m

For installation, follow the instructions supplied with the speci

¿

 c 

Содержание Start Aqua Condens 25 BIS

Страница 1: ...6WDUW TXD RQGHQV 6 EN INSTALLER AND USER MANUAL FR MANUEL D INSTALLATION ET D UTILISATION PT MANUAL DO USU RIO E DO INSTALADOR HU TELEP T SI S HASZN LATI K ZIK NYV GR...

Страница 2: ...013 Manuel de l utilisateur de l installateur 23 l ments de fonctionnement de la chaudi re 104 Circuit hydraulique 106 Sch mas lectriques 109 Hauteur de charge r siduelle 113 5 Dans certaines parties...

Страница 3: ...U felhatalmaz son alapul rendelet 814 2013 EU felhatalmaz son alapul rendelet 8 Telep t si k zik nyv felhaszn l i k zik nyv 63 A k sz l k funkcion lis r szei 104 V zkeringet s 106 Elektromos rajzok 10...

Страница 4: ...ainers at the corresponding collection centres 9 When disposing of waste be careful not to harm human health or employ procedures or methods which may damage the environment At the end of its life the...

Страница 5: ...ing properly if the heat exchanger for heating has sufficient water circulation For this reason the boiler is fitted with an automatic by pass that sets the correct flow rate for the water in the heat...

Страница 6: ...discharge manifold is not blocked by solid residues that might prevent the out ow of condensate water 9 The manufacturer is not liable for any damage resulting from the failure to channel the condens...

Страница 7: ...that the gas type is suitable for the appliance the piping is thoroughly clean 9 The gas feeding system must be adapted to the boiler output and must be equipped with all the safety and control device...

Страница 8: ...are within the indicated values 3DUDPHWHUV XQLW RI PHDVXUHPHQW RW ZDWHU FLUFXLW LOOLQJ ZDWHU pH value 7 8 Hardness F 15 Appearance clean Fe mg kg 0 5 Cu mg kg 0 1 Once the hydraulic connections have...

Страница 9: ...ust ll the siphon with water and make sure that the condensation is evacuated correctly Fill the condensation collection siphon pouring 1 litre of water into the boiler combustion analysis outlet with...

Страница 10: ...eat request The boiler continues to function until the temperatures set on the boiler are reached or the heat request terminates it will then go back to standby In the case of a temporary stop the dig...

Страница 11: ...ted power supply pressure values indicated in the table Turn off the hot water tap Disconnect the pressure gauge and tighten the pressure test point screw again upstream from the gas valve RPEXVWLRQ F...

Страница 12: ...do the fixing screws of the terminal board cover unhook the board cover 9 Live electrical parts 230 Vac The settable KT values are as follows standard system 1 0 1 5 2 0 2 5 3 0 floor installation 0 2...

Страница 13: ...to the required position The boiler will carry out a venting cycle lasting about 2 minutes If pressure drops are frequent request the intervention of the Technical Assistance Centre DXOW The boiler f...

Страница 14: ...ment panel refer to previous chapters for the detail of the figures Undo the fixing screws of the cover to access the terminal board Press the CO button once 9 Live electrical parts 230 Vac Wait for t...

Страница 15: ...sembly 9 After conversion adjust the boiler again following the indica tions in the speci c section and apply the new identi cation label contained in the kit Conversion from a family gas to other fam...

Страница 16: ...handed over to a differentiated waste collection centre DVLF VDIHW UXOHV Remember that the use of products requiring fuels electricity and water necessitates the respect of certain basic safety rules...

Страница 17: ...and the time taken to reach it the boiler automatically varies the heating water temperature by reducing operating time thereby achieving increased comfort and energy savings 7 5 02 GMXVWLQJ WKH KHDWL...

Страница 18: ...essure switch alarm A04 Definitive lockout NTC domestic water fault A06 Signal 2 5 67 786 63 7 3 2 50 NTC heating outlet fault A07 Temporary stop Heating outlet probe over temperature Temporary then d...

Страница 19: ...water and gas safety devices Checking the gas output and make any adjustments Checking the draught and flue gases pipe Cleaning of the burner and checking its firing Checking the hydraulic operations...

Страница 20: ...e 98 1 Useful efficiency Pn max Pn min 50 30 105 0 108 0 Useful efficiency 30 30 return 107 1 Ef ciency at average Pn Range Rated 80 60 98 6 Ef ciency at average Pn Range Rated 50 30 105 8 Electric po...

Страница 21: ...a 45 90 bend m 1 3 1 6 Hole in wall diameter mm 105 RQFHQWULF XH JDV GLVFKDUJH SLSHV Diameter mm 80 125 Maximum length m 14 85 Drop due to insertion of a 45 90 bend m 1 1 5 Hole in wall diameter mm 1...

Страница 22: ...rated 25 kW 6HDVRQDO VSDFH KHDWLQJ HQHUJ HIILFLHQF s 92 For boiler space heaters and boiler combination heaters useful heat output For boiler space heaters and boiler combination heaters useful effici...

Страница 23: ...Return NTC probe 5 eOpPHQWV IRQFWLRQQHOV GH OD FKDXGLqUH 1 Robinet de remplissage 2 Collecteur d chappement 3 Pressostat eau 4 Robinet de vidange 5 Vanne 3 voies 6 Vanne de s curit de chauffage 7 Pom...

Страница 24: ...HQWRV IXQFLRQDLV GD FDOGHLUD 1 Tampa de enchimento 2 Colector de exaust o 3 Transdutor de press o 4 V lvula de descarga 5 V lvula solenoide de tr s vias 6 V lvula de seguran a aquecimento 7 Bomba de c...

Страница 25: ...FXLW K GUDXOLTXH 1 Vanne de s curit de chauffage 2 By pass automatique 3 Soupape trois voies 4 Circulateur 5 Soupape d a ration inf rieur 6 Vase d expansion de chauffage 7 Sonde NTC retour 8 Echangeur...

Страница 26: ...glage de la temp rature de l eau sanitaire Fonction d analyse de la combustion seulement pour le Service apr s vente 37 3DLQHO GH FRPDQGR 1 Hidr metro 2 Display digital que sinaliza a temperatura de...

Страница 27: ...lati meleg v z h m rs klete vagy zemhiba 5 HVFULSWLRQ GHV LF QHV Chargement du syst me cette ic ne est affich e avec le code d anomalie A 04 R gulation thermique cette ic ne indique la connexion une s...

Страница 28: ...F External fuse 3 15A F M2 Terminal board for external connections low temperature thermostat general alarm M2a Terminal board for external connections DHW timer M3 Terminal board for external connect...

Страница 29: ...rio de gua interno com sonda JP4 inserido JP5 Ponte para seleccionar o funcionamento em regime de aquecimento adequado apenas para reservat rio de gua interno JP5 inserido JP6 Habilitar fun o de comp...

Страница 30: ...fic capacity 12 NOx Value class 5 1XPpUR GH VpULH Fonctionnement avec eau chaude sanitaire Fonction de chauffage 4Q Capacit nominale 3Q Puissance nominale 4P Capacit minimale 3P Puissance minimale 3 I...

Страница 31: ...os externos dever o ser ligados como indicado na figura nas respetivas r guas de terminais previstas para a liga o M6 OT Sonda Externa Term stato ambiente ou P O R ap s a retirada da cavilha em U pret...

Страница 32: ...h discharge head modulating circulator kit curve 7m Residual head mbar System flow rate l h 5 Courbe du circulateur modulant de s rie 6m Courbe du kit circulateur modulant hauteur lev e 7m Hauteur mba...

Страница 33: ...6WDUW TXD RQGHQV 6 114 75 R SC M G AC AF 65 85 75 33 90 90 87 78 5 39 171 75 256 25 142 5 219 5 65 954 940 85 108 90 90 8 7 6 5 3 4 50 mm 50 mm 200 mm...

Страница 34: ...3 CN14 SW1 P4 Jumper non inserito installazione standard Jumper inserito installazione standard 15 1 Jumper not inserted standard installation Jumper inserted floor installation 5 Cavalier non ins r i...

Страница 35: ...a m 16 17 117 62 5 18 1 A Adaptor 60 80 5 A Adaptateur 60 80 37 A Adaptator 60 80 8 A Adapter 60 80 5 A 60 80 131 5 0 10 20 30 40 50 60 70 0 10 20 30 40 50 60 70 80 90 5 Longueur maximale des tuyaux 8...

Страница 36: ...W TXD RQGHQV 6 117 22 23 24 1 2 3 4 5 25 C53 C33 C33 C93 C83 C43 C43 B23 C13 C13 C53 max 50 cm uscita posteriore A max 50 cm 21 1 A Rear outlet 5 A Sortie arri re 37 A Sa da Traseira 8 A H ts kimenet...

Страница 37: ...r leur _____________________________ 37 5 1 5 7 1 O valor de calibragem da capacidade t rmica em aquecimento ___________ kW equivalente a uma velocidade m xima do ventilador em aquecimento de ________...

Отзывы: