INSTALLATION

4.3 

Water connections

Condexa  Pro2  EVO  thermal  modules  are  made  up  of  2,  3  or  4 

thermal elements which are common to all the boilers belong-

ing to the same family and they have a thermal power of 75 kW .

Each thermal module is equipped with the following connec-

tions which have been pre-set for the connection to the system 

(see table).

MANIFOLD

DIMENSION

REMARKS

CONNECTION 

TYPE

upper water 

manifold

2” 1/2

system inlet

Flanged man-

ifolds for an 

easy connec-

tion to the 

system

lower water 

manifold

2” 1/2”

system  outlet

gas manifold 2”

the gas inlet can 

be connected 

simultaneously to 

the two ends of 

the boiler

condensate 

manifold

50 mm

connect to sewer 

system

see “4.6 Up-

grading existing 

systems”

Socked ends 

manifolds for 

an easy real-

ization of the 

flue system 

using plastic 

pipes (PP).

flue pipe 

(singol unit) 160 mm

see “4.8 Position-

ing and prepara-

tion for installa-

tion”

4.4 

System cleaning and water treatment

This preventive measure is absolutely required whenever a heat 

generator needs to be replaced in  but it is in any case recom-

mended also on new systems, in order to remove any waste, 

dirt, working residues, etc.

To clean the system, if the old generator is still present in the 

system:

 

− add a descaling additive to the system water (contact the 

R

 Technical Assistance Service);

 

− Have the system operate with the generator ON for ap-

proximately 7 days;

 

− Discharge the system’s dirty water and wash the system 

once or several times using clean water.

If the system is very dirty, repeat the last procedure one more 

time.

If the old generator is not present or available, use a pump to 

circulate the water + additive through the system for about 10 

days and perform a final washing as described in the previous 

paragraph.

At  the  end  of  cleaning  operations,  before  installing  boiler 

Condexa Pro2 EVO

, it is advisable to add protection) to the sys-

tem water (contact the 

R

 Technical Assistance Service);

 

9

Where softened water is used it is compulsory to re-check 

conformity to tolerances for water in regular service after 8 

weeks from topping up and in particular the electrical con-

ductivity.

 

9

No controls are required when using de-mineralized water.

4.4.1 

General instructions

 

9

An  automatic  filling  system  may  not  be  used  for  topping 

up, which must be done manually and recorded in the unit 

handbook.

 

9

If there are more than one boiler, they must all be put into 

service  either  contemporarily  or  with  a  very  low  rotation 

time during the initial period of service, so as to evenly dis-

tribute the limited quantity of initial lime-scale.

 

9

A flushing cycle must be programmed after the plant has 

been installed to flush out any installation debris.

 

9

Water used for filling or for eventually topping up the system 

must always be filtered (synthetic or metal mesh filters with 

filtering capacity of no less than 50 micron) to avoid depos-

its possibly triggering off  under-deposit corrosion.

 

9

The heating system must be flushed out and cleaned with 

good workmanship before filling up the existing systems. 

The boiler may not be filled until after the heating system 

has been flushed out.

4.5 

New heating systems

 

9

The system must be filled up slowly the first time; once it is 

filled and the air expelled it should never need to be topped 

up again.

 

9

The system must be turned to maximum service tempera-

ture during the initial ignition to facilitate deaeration (a too 

low temperature prevents the gas from coming out).

4.6 

Upgrading existing systems

Where the boiler has to be replaced it is not recommended to fill 

up again if the quality of the water in the existing systems con-

forms to specifications. If the quality of water fails to conform to 

specifications, we recommend either re-treating it or separating 

the systems (the water quality requirements must be respected 

in the boiler system).

4.7 

Corrosion

Under-deposit corrosion

Under-deposit corrosion is an electrochemical process, due to 

the presence of sand, rust, etc., inside the mass of water. These 

solid substances generally deposit on the bottom of the boiler 

(sludge), on tube and pipe heads or in the gaps between pipes 

and tubes.

Micro-corrosion phenomena may be triggered off owing to the 

difference in electrochemical potential coming to be created be-

tween the material in contact with the impurity and the sur-

rounding one.

Corrosion from stray currents

Corrosion from stray currents can occur due to the differing elec-

trical potentials between water in the boiler and the metallic 

mass of the boiler or piping. This process leaves unmistakeable 

traces i.e. small regular conical holes.

 

9

It is advisable to connect up the various metal parts to a 

good earthing system.

 

9

The systems must always be separated if oxygen is either 

continuously  or  occasionally  introduced  into  the  installa-

tions (e.g. floor heating without pipes in synthetic material 

resistant to diffusion, open vessel systems, frequent topping 

up).

From what we have seen it is therefore important to avoid two 

factors possibly leading to the above mentioned processes i.e. 

contact between air and water in the installation and regular 

topping up with fresh water.

To eliminate contact between air and water (and to prevent the 

Содержание Condexa Pro2 150 Evo IN A

Страница 1: ...cod 20094445 rev 5 12 2015 Condexa Pro2 EVO EN INSTALLATION INSTRUCTIONS...

Страница 2: ...supply 12 6 2 Electrical connections 12 6 2 1 Connection to mains 12 6 2 2 Connection to thermoregulators 12 6 2 3 Connection to pumps 13 6 2 4 Connection to room thermostats on off 14 6 2 5 Connecti...

Страница 3: ...weather conditions after it has been unpacked anyhow to temperatures below 4 C or above 40 C until it has been connected up to the water gas and electricity mains so as to be able to activate the fros...

Страница 4: ...ion for both single 0 0It is forbidden to obstruct the condensate drain 0 0It is forbidden to pull detach twist the wiring coming out of the heating unit even if unplugged from the power supply 0 0It...

Страница 5: ...o the system in parallel posi tion as compared to the others through a flow return gas flue manifold and condensate discharge manifold According to the heat demand the regulation system switches on an...

Страница 6: ...Fan 6 Return detection tap 7 Pump or 2 way valve 8 Control panel 9 Return probe 10 Exhaust flue probe 11 Water differential pressure switch 12 Gas valve 13 Ignition electrode 14 Automatic vent valve 1...

Страница 7: ...o 92 42 EEC Directive Max pressure and temperature Pms NOx class NOx Figure 6 0 0It is forbidden to remove or mishandle the identification plates markings and any other making it difficult to safely i...

Страница 8: ...o evenly dis tribute the limited quantity of initial lime scale 9 9A flushing cycle must be programmed after the plant has been installed to flush out any installation debris 9 9Water used for filling...

Страница 9: ...installation can vary according to specific requirements of space or to the type of the installation itself e g leaned against the wall back to back etc in any case make sure that same necessary spac...

Страница 10: ...s of each unit and in some points of the hydraulic system specific for this purpose For more information on the characteristics of hydraulic system see 5 Installation diagrams in which different types...

Страница 11: ...ly be adapted to the man ufacturing characteristics of the relevant heating unit with the purpose of exploiting the boiler potentials to the full and main tain the entire installation efficient for as...

Страница 12: ...should break call in qualified personnel to replace it Always re fer to the data given in the diagrams in this handbook for operations of an electrical nature Remember that R is not to be held liable...

Страница 13: ...ower on circulators external devices directly from the network with no electrical load passing through the fuse of the board Moreover in case of emergency mode the manual device 0 1 AUTO controls the...

Страница 14: ...14 related to the Ch1 high temperature system and 22 Ch2 low temperature system are in fact in default and set in weather function Should one not want to connect the probe the boiler must be made to...

Страница 15: ...t upper water manifold is equipped with two pock ets where the temperature probe has to be inserted The latter probe continuously checks the flow temperature of the heating circuit Either you are inst...

Страница 16: ...show the flow temperature e g T1 80 C Adjust combustion by the screws shown in Figure 17 until reaching the rated CO2 value see table turning the screws clockwise to reduce the value N B Turn an ti c...

Страница 17: ...ons activated by pressing a button or combination of two buttons pressed together Furthermore each button has a specific function depending on the selected user mode Figure 20 BUTTON KEY DESCRIPTION S...

Страница 18: ...e values and operating status of the various circuits Press the button to scroll forward and view the values set for the individual circuits The values listed below will be displayed in succession by...

Страница 19: ...oint to the desired value e g 40 C 5 Press OK to memorize the new value 6 After 3 secs the display will return to the display mode with the new setpoint If there is no change after pressing Set esc fo...

Страница 20: ...to view and change the user and installer parameters Procedure for accessing the programming mode POS PROCEDURE DISPLAY 1 Manifold delivery temperature T1 e g T1 80 C 2 Press Set esc and OK After 5s t...

Страница 21: ...ated for identifying the errors POS PROCEDURE DISPLAY 1 The display starts to flash to indicate one or more errors 1 b Press the address of the first unit will appear on the display alternating with t...

Страница 22: ...limit preset to 80 C 100 90 80 T_CH_High_foot 70 T_out_min 60 50 T_out_max 40 30 20 10 0 25 20 15 10 5 0 5 10 15 20 T_CH_High Delivery temperature C CLIMATIC CURVE HIGH TEMPERATURE CIRCUIT HEATING RE...

Страница 23: ...mperature Setpoint shut off hysteresis The setpoint in this case coincides with the value set for param eter 1 Setpoint_t_ch_high if the high temperature thermostat contact is closed whereas it is cal...

Страница 24: ...es the Master control unit can only add a new burner when another is on If the Master control unit must increase the number of ignited burners first check that the next burner can be ignited no er ror...

Страница 25: ...temperature or power The analogue input see terminals 13 14 on the wiring diagram on page 35 is only for the Master card and can also be used for the low temperature circuit Par 22 The analogue input...

Страница 26: ...od of time equal to half the value set in Par 29 Time s Collector temperature Figure 25 Temperature Flow Mix C 20 30 40 50 60 Closing Opening Valve s 4 3 2 1 0 1 3 25 35 45 55 2 Open Close default Par...

Страница 27: ...30 1 255 Setpoint of power supplied in hot water mode 8 h w max T 60 C 10 C 80 C Max value hot water setpoint 9 h w Priority 0 0 2 Hot water system priority 0 1 Hot water functioning with heating unti...

Страница 28: ...r valve stand by differential 33 Power control 1 0 1 0 power distributed over min number burners 1 power distributed over max number burners 34 Pump mode 0 0 1 Third pump setpoint 0 Main pump of syste...

Страница 29: ...32 33 Slaves not present Check that the bipolar switches of the individual units are ON Check the addresses on the slave Check the slave BUS connection Replace the Master card Replace the Slave card E...

Страница 30: ...It was pressed more than 7 times in 30 min Wait for the error to disappear If the error did not disappear after max 40 min re place the Slave card E35 35 Water differential pressure switch error cont...

Страница 31: ...J14 1 R1 4 3 T1 o t o m e r r t n o c s u b E o t o m e r r t n o c V 4 2 1 c r i c A T 2 c r i c A T 2 4 J1 PC E D O C R A B C T N 1 1 1 1 J 2 c r i c d n a m C T N 1 c r i c d n a m C T N C T N Pol...

Страница 32: ...n 2 3 4 J6 J14 J15 J2 F1 J8 J7 3 1 5 a 1 2 3 m gv gv 4 gv 1 T1 6 5 J6 a 5 m J2 3 2 1 4 gv 1 T1 Slave n 1 J3 2 3 1 J16 m a TO MAIN POLO GROUND TO MAIN POLO GROUND PUMP GROUND GROUND GROUND NEUTRAL PHAS...

Страница 33: ...ate production per hour 100 50 30 C with G20 gas kg h 22 4 33 6 44 8 Efficiency at rated power 80 60 C 98 1 98 1 98 1 Efficiency at rated power 50 30 C 108 1 108 1 108 1 Efficiency at min power 80 60...

Страница 34: ...fficiency in DHW mode WH Daily electrical energy consumption Qelec kWh Daily fuel consumption Qfuel kWh Annual electrical energy consumption AEC kWh Annual fuel consumption AFC GJ 14 WATER IN CENTRAL...

Страница 35: ...rms to require ments If the quality of water fails to conform to requirements either recondition the old water or separate the water circuits water in the boiler circuit must conform to requirements 3...

Страница 36: ...go VR Tel 0442630111 Fax 044222378 www riello it As part of the company s ongoing commitment to perfecting its range of products the appearance dimensions technical data equipment and accessories may...

Отзывы: