TECHNICAL FEATURES

Figure 1   

The insertion of a single thermal element in cascade, over the 

traditional rotation of the ignition, can take place with 

variable 

factor of heating power load

, so that when a certain power 

percentage of the first element is reached (e.g. 30%), the suc-

cessive element already starts with the same load factor. This 

latter feature allows to share the power supplied inside more 

than one heat exchangers with a power/exchange surface ratio 

which is particularly favourable for condensation latent heat.

3.2 

Advantages

 

− Totally pre-mixed micro-flame jet burner;

 

− condensing stainless steel exchanger, with efficiency up 

to 109% (see  “Figure 1”);

 

− power from 15 to 300 kW ;

 

− maximum exhaust flue exit temperature 80°C;

 

− plastic flue manifold in PP self-extinguishing (“4.11 Ex-

haust flue” page 10:

 

− water manifold, condensate and smoke manifold inside 

the boiler;

 

− quick  connection  of  both    water,  condensate  and  flue 

manifolds (with exit on the right and left side);

 

− weather temperature adjustment device supplied;

 

− modulating and modular regulation of the single thermal 

elements power;

 

− automatic  changeover  (at  adjustable  time  intervals)  of 

the burners ignition order;

 

− choice  of  the  cascade  insertion  criteria  of  the  burner 

(power %);

 

− hot water and systems control at different temperatures, 

with or without function priority;

 

− automatic summer/winter switch-over;

 

− anti-legionella  mode  (only  available with  remote  con-

trol);

 

− hour  and  week  programming  schedule  (only  available 

with remote control);

 

− minimum flow capacity of thermal carrier fluid controlled 

by a differen-tial pressure switch;

3.3 

Safety devices

All  the  functions  of  the  thermal  module  are  electrically  con-

trolled. Any anomaly causes the lock out of the single thermal 

element and the automatic shut down of the gas valve.

The water circulation system includes:

 

− safety water differential pressure switch for each thermal 

element;

 

− auto reset safety thermostat for  each thermal element;

 

− temperature probe on each thermal element flow and 

return. Probes are managed by an electronics homolo-

gated for safety performances and with a double proces-

sor technology. Such device allows to continually control 

both flow temperature and the 

Δ

t between flow and re-

turn of the battery element;

 

− modulating flow temperature regulation for both single 

 

0

It is forbidden to obstruct the condensate drain.

 

0

It is forbidden to pull, detach, twist the wiring coming out of 

the heating unit, even if unplugged from the power supply.

 

0

It is forbidden to obstruct or reduce the size of air vents.

 

0

It is forbidden to expose the boiler to atmospheric agents (if 

it is not a specific unit for outdoors).

 

0

It is forbidden to leave containers or flammable substances 

in the premises where the boiler is installed.

 

0

Do not dispose of packaging material into the environment, 

or leave it within the reach of children, since it can become 

a potential hazard. Dispose of packaging material in com-

pliance with applicable legislation.

 

0

The user is forbidden to open the cupboard containing the 

heating unit. Any jobs on the inside of the latter must be 

done by the Technical Assistance Service or by qualified per-

sonnel.

 

0

It is forbidden to discard the product as household waste. 

At the end of its service life, it can be consigned to specific 

selected waste centres provided by the local authorities or 

else to dealers providing this service. Disposing of a domes-

tic appliance separately will prevent possible harmful con-

sequences for environment and health derived from inap-

propriate disposal, likewise making it possible to recuperate 

the materials it is made of with substantial savings in energy 

and resources.

TECHNICAL FEATURES

3.1 

Main features

Condexa Pro2 EVO is a condensing, modular, pre-mixed, blown, 

thermal group; it is made up of a series of thermal elements 

installed in battery.

A unit is made of N° 2, 3 or 4 heat exchangers, each with a mod-

ulating power from 15 to 75 kW; equipped with climatic regula-

tion and RS485 connection.

The efficiency of the generators reaches 109% based on the low-

er heat potential of natural gas (Hi) making it possible to use  a 

flue manifold entirely made of plastic (PP) diameter of 160mm  

plus socked ends manifolds.

The system also enables continual modulation of the gas and 

combustion air flow.

The Condexa Pro2 EVO heating unit is the optimum as far as op-

erating costs (up to 109% efficiency per Hi, see ) reliability and 

flexibility. In fact, thanks to the new heat exchanger with im-

proved power, to the new electronic management, to the mod-

ularity and versatility, it is possible to make a rapid connection 

to any kind of heating system and storage hot water production 

with the possibility to manage three circuits operating at three 

different temperatures.

Содержание Condexa Pro2 150 Evo IN A

Страница 1: ...cod 20094445 rev 5 12 2015 Condexa Pro2 EVO EN INSTALLATION INSTRUCTIONS...

Страница 2: ...supply 12 6 2 Electrical connections 12 6 2 1 Connection to mains 12 6 2 2 Connection to thermoregulators 12 6 2 3 Connection to pumps 13 6 2 4 Connection to room thermostats on off 14 6 2 5 Connecti...

Страница 3: ...weather conditions after it has been unpacked anyhow to temperatures below 4 C or above 40 C until it has been connected up to the water gas and electricity mains so as to be able to activate the fros...

Страница 4: ...ion for both single 0 0It is forbidden to obstruct the condensate drain 0 0It is forbidden to pull detach twist the wiring coming out of the heating unit even if unplugged from the power supply 0 0It...

Страница 5: ...o the system in parallel posi tion as compared to the others through a flow return gas flue manifold and condensate discharge manifold According to the heat demand the regulation system switches on an...

Страница 6: ...Fan 6 Return detection tap 7 Pump or 2 way valve 8 Control panel 9 Return probe 10 Exhaust flue probe 11 Water differential pressure switch 12 Gas valve 13 Ignition electrode 14 Automatic vent valve 1...

Страница 7: ...o 92 42 EEC Directive Max pressure and temperature Pms NOx class NOx Figure 6 0 0It is forbidden to remove or mishandle the identification plates markings and any other making it difficult to safely i...

Страница 8: ...o evenly dis tribute the limited quantity of initial lime scale 9 9A flushing cycle must be programmed after the plant has been installed to flush out any installation debris 9 9Water used for filling...

Страница 9: ...installation can vary according to specific requirements of space or to the type of the installation itself e g leaned against the wall back to back etc in any case make sure that same necessary spac...

Страница 10: ...s of each unit and in some points of the hydraulic system specific for this purpose For more information on the characteristics of hydraulic system see 5 Installation diagrams in which different types...

Страница 11: ...ly be adapted to the man ufacturing characteristics of the relevant heating unit with the purpose of exploiting the boiler potentials to the full and main tain the entire installation efficient for as...

Страница 12: ...should break call in qualified personnel to replace it Always re fer to the data given in the diagrams in this handbook for operations of an electrical nature Remember that R is not to be held liable...

Страница 13: ...ower on circulators external devices directly from the network with no electrical load passing through the fuse of the board Moreover in case of emergency mode the manual device 0 1 AUTO controls the...

Страница 14: ...14 related to the Ch1 high temperature system and 22 Ch2 low temperature system are in fact in default and set in weather function Should one not want to connect the probe the boiler must be made to...

Страница 15: ...t upper water manifold is equipped with two pock ets where the temperature probe has to be inserted The latter probe continuously checks the flow temperature of the heating circuit Either you are inst...

Страница 16: ...show the flow temperature e g T1 80 C Adjust combustion by the screws shown in Figure 17 until reaching the rated CO2 value see table turning the screws clockwise to reduce the value N B Turn an ti c...

Страница 17: ...ons activated by pressing a button or combination of two buttons pressed together Furthermore each button has a specific function depending on the selected user mode Figure 20 BUTTON KEY DESCRIPTION S...

Страница 18: ...e values and operating status of the various circuits Press the button to scroll forward and view the values set for the individual circuits The values listed below will be displayed in succession by...

Страница 19: ...oint to the desired value e g 40 C 5 Press OK to memorize the new value 6 After 3 secs the display will return to the display mode with the new setpoint If there is no change after pressing Set esc fo...

Страница 20: ...to view and change the user and installer parameters Procedure for accessing the programming mode POS PROCEDURE DISPLAY 1 Manifold delivery temperature T1 e g T1 80 C 2 Press Set esc and OK After 5s t...

Страница 21: ...ated for identifying the errors POS PROCEDURE DISPLAY 1 The display starts to flash to indicate one or more errors 1 b Press the address of the first unit will appear on the display alternating with t...

Страница 22: ...limit preset to 80 C 100 90 80 T_CH_High_foot 70 T_out_min 60 50 T_out_max 40 30 20 10 0 25 20 15 10 5 0 5 10 15 20 T_CH_High Delivery temperature C CLIMATIC CURVE HIGH TEMPERATURE CIRCUIT HEATING RE...

Страница 23: ...mperature Setpoint shut off hysteresis The setpoint in this case coincides with the value set for param eter 1 Setpoint_t_ch_high if the high temperature thermostat contact is closed whereas it is cal...

Страница 24: ...es the Master control unit can only add a new burner when another is on If the Master control unit must increase the number of ignited burners first check that the next burner can be ignited no er ror...

Страница 25: ...temperature or power The analogue input see terminals 13 14 on the wiring diagram on page 35 is only for the Master card and can also be used for the low temperature circuit Par 22 The analogue input...

Страница 26: ...od of time equal to half the value set in Par 29 Time s Collector temperature Figure 25 Temperature Flow Mix C 20 30 40 50 60 Closing Opening Valve s 4 3 2 1 0 1 3 25 35 45 55 2 Open Close default Par...

Страница 27: ...30 1 255 Setpoint of power supplied in hot water mode 8 h w max T 60 C 10 C 80 C Max value hot water setpoint 9 h w Priority 0 0 2 Hot water system priority 0 1 Hot water functioning with heating unti...

Страница 28: ...r valve stand by differential 33 Power control 1 0 1 0 power distributed over min number burners 1 power distributed over max number burners 34 Pump mode 0 0 1 Third pump setpoint 0 Main pump of syste...

Страница 29: ...32 33 Slaves not present Check that the bipolar switches of the individual units are ON Check the addresses on the slave Check the slave BUS connection Replace the Master card Replace the Slave card E...

Страница 30: ...It was pressed more than 7 times in 30 min Wait for the error to disappear If the error did not disappear after max 40 min re place the Slave card E35 35 Water differential pressure switch error cont...

Страница 31: ...J14 1 R1 4 3 T1 o t o m e r r t n o c s u b E o t o m e r r t n o c V 4 2 1 c r i c A T 2 c r i c A T 2 4 J1 PC E D O C R A B C T N 1 1 1 1 J 2 c r i c d n a m C T N 1 c r i c d n a m C T N C T N Pol...

Страница 32: ...n 2 3 4 J6 J14 J15 J2 F1 J8 J7 3 1 5 a 1 2 3 m gv gv 4 gv 1 T1 6 5 J6 a 5 m J2 3 2 1 4 gv 1 T1 Slave n 1 J3 2 3 1 J16 m a TO MAIN POLO GROUND TO MAIN POLO GROUND PUMP GROUND GROUND GROUND NEUTRAL PHAS...

Страница 33: ...ate production per hour 100 50 30 C with G20 gas kg h 22 4 33 6 44 8 Efficiency at rated power 80 60 C 98 1 98 1 98 1 Efficiency at rated power 50 30 C 108 1 108 1 108 1 Efficiency at min power 80 60...

Страница 34: ...fficiency in DHW mode WH Daily electrical energy consumption Qelec kWh Daily fuel consumption Qfuel kWh Annual electrical energy consumption AEC kWh Annual fuel consumption AFC GJ 14 WATER IN CENTRAL...

Страница 35: ...rms to require ments If the quality of water fails to conform to requirements either recondition the old water or separate the water circuits water in the boiler circuit must conform to requirements 3...

Страница 36: ...go VR Tel 0442630111 Fax 044222378 www riello it As part of the company s ongoing commitment to perfecting its range of products the appearance dimensions technical data equipment and accessories may...

Отзывы: