
10
INStAllAtION
panels.
Side panels removing:
—
open the fixing pin
—
open the air intake grill
—
unfasten the grid
—
repeat for all elements
—
unscrew the fastening screws
—
remove the side panels
leak test:
The unit is supplied as pre-charged with nitrogen.
—
partially loosen one fitting plug
—
check for nitrogen leaks to verify that there is pressure in-
side the device
9
If pressure down, do not continue installation and check for
leakage inside the unit.
9
Contact
R
Technical Support Service.
Horizontal ceiling mounting
—
position the support rods and fix them properly to the
bearing structures
WItHOUt fAlSE CEIlING
1
Fastening nut (supplied)
2
Fastening nut M10 (not supplied)
3
Ceiling
1
2
3
10 ÷ 15
WItH fAlSE CEIlING
1
Fastening nut (supplied)
2
Fastening nut M10 (not supplied)
3
false ceiling
3
1
1
2
10 ÷ 15
—
place the nuts on the threaded bars
1
Threaded rods
2
Support bracket
3
false ceiling
4
4 ways panel
—
hook the unit to the threaded bars