78
COMMISSIONING AND MAINTENANCE
For all models
− Open the general fuel shut-off valve.
− Open the tap of the unit you are working on.
− Place the main system switch, the main switch of the
module and the one of the unit on which you are work-
ing on "ON".
− Make sure that there is no heat or DHW demand.
It is now necessary to change the setting of the parameter 98.
Proceed as follows:
− On the home screen of the control panel, press the
●
key
− Select "Settings" with the
▲
/
▼
keys and press the
●
key
− Select "Device configuration" with the
▲
/
▼
keys and
press the
●
key
“
Settings
”
“
Boiler Settings
”
“
Clock Settings
”
“
PB Configuration
”
“
Appliance Configuration
”
− Enter the password as described in paragraph "Password
access"
− Select the unit between "Master" and "Dep1 ... N"
− Press the
▼
button, select "(98) Model Setup" and press
the
●
“
Appliance Configuration
”
“
(97) IO Configuration
”
1
“
(98) Appliance Settings
”
2
“
Configuration Confirmed
”
“
No
”
− With the
▲
/
▼
keys change the value following what is in
the following table and press the
●
key:
Model
Parameter 98
Steel Pro Power
114-2 P/V
12
Steel Pro Power
140-2 P/V
10
Steel Pro Power
180-2 P/V
8
Steel Pro Power
230-2 P/V
4
Steel Pro Power
270-2 P/V
2
Steel Pro Power
300-3 P/V
6
Steel Pro Power
345-3 P/V
4
Steel Pro Power
405-3 P/V
2
Steel Pro Power
460-4 P/V
4
Steel Pro Power
540-4 P/V
2
− Press the
▼
key, select "Config. Confirmed" and press the
●
key
− With the
▲
/
▼
keys change the value to "Yes" and press
the
●
key
“
Appliance Configuration
”
“
(97) IO Configuration
”
1
“
(98) Appliance Settings
”
4
“
Configuration Confirmed
”
“
Yes
”
At this point the systems starts an application update process.
Once this is finished, the menu "Settings" appears on the menu.
Repeat this operation for all the modules.
− Press
◄
until you return to the home screen
An error message is displayed for a few seconds and then the
display returns to its normal state.
Apply the new gas label supplied in the kit on completion of the
conversion.
Gruppo termico regolato per:
G30 - G31 28-30/37 mbar
Paese di destinazione:
After installing the accessory, check all gaskets tightness.
Carry out all calibration activities described in Paragraph "Ad-
justments".
Restore the desired set points.
Содержание 20138572
Страница 109: ...109 SYSTEM MANAGER RECYCLING AND DISPOSAL...
Страница 110: ...110 SYSTEM MANAGER RECYCLING AND DISPOSAL...
Страница 111: ...111 SYSTEM MANAGER RECYCLING AND DISPOSAL...