75
COMMISSIONING AND MAINTENANCE
− Press the MENU key, select "System test" and press
●
to
confirm.
“
Menu
”
“
Domestic Hot Water (DHW)
”
“
Information
”
“
Settings
”
“
System Test
”
− select the unit between "Master" and "Dep1 ... N"
“
System Test
”
“
Boiler
”
“
Managing
”
− select "Max. power" with the
▲
/
▼
keys and press
●
to
confirm. The fan starts turning at its maximum speed
(which can vary based on the model).
“
System Test
”
“
Test State
”
“
High Power
”
“
Fan Speed
”
0
“
rpm
”
“
Ionisation
”
0.0 μA
DESCRIPTION
G20
G30
G31
Wobbe index
45,7
80,6
70,7
MJ/m
3
Nominal supply pressure
20
28-30
37
mbar
After the checks:
− select "OFF" with the
▲
/
▼
keys and press
●
to confirm.
− Disconnect the pressure gauge and tighten again the
pressure test point screw (1) upstream from the gas valve.
“
System Test
”
“
Test State
”
“
Off
”
“
Fan Speed
”
0
“
rpm
”
“
Ionisation
”
0.0 μA
− After completing the operations, close the module doors.
Содержание 20138572
Страница 109: ...109 SYSTEM MANAGER RECYCLING AND DISPOSAL...
Страница 110: ...110 SYSTEM MANAGER RECYCLING AND DISPOSAL...
Страница 111: ...111 SYSTEM MANAGER RECYCLING AND DISPOSAL...