4.
Slide the punch unit [4] along its rails into the finisher. Make sure that pin engages correctly
at the front and rear.
5.
Connect and fasten the punch unit [5] (
x 2,
x 1).
• The connectors [6] are coiled and tied above the PCB on the right.
6.
Fasten the slide drive unit [7] to finisher and connect it to the punch unit (
x 2,
x 1).
Press in on the slide drive unit at
¶
when you attach screw
·
.
7.
Make sure that the punch unit moves freely and is not blocked by the screws.
8.
Insert the side-to-side detection unit [8]. Make sure that the two pins are engaged correctly
at the front.
Punch Unit (B702)
91
1
Содержание G148
Страница 1: ...Model MT P2 Machine Code G148 SERVICE MANUAL 23 June 2006 Subject to change...
Страница 52: ...10 Clamp 1 LCT B473 51 1...
Страница 67: ...Installation Unplug the machine power cord before starting the following procedure 1 Installation 66 1...
Страница 68: ...1 Unpack the finisher and remove all tapes and shipping retainers 3000 Sheet Finisher SR842 B706 67 1...
Страница 94: ...16 Set the hopper 13 in its holder Punch Unit B702 93 1...
Страница 129: ...2 Preventive Maintenance 128 2...
Страница 163: ...1 Open the front door 2 Pull out the internal dust filter A 3 Replacement and Adjustment 162 3...
Страница 172: ...4 Development motor bracket D x 3 x 1 5 Development motor E x 4 Development Unit 171 3...
Страница 207: ...3 Remove the left tandem tray D x 5 4 Right tandem tray E x 2 3 Replacement and Adjustment 206 3...
Страница 237: ...3 Replacement and Adjustment 236 3...
Страница 244: ...Jam Detection Sensor Locations The illustration below shows the locations of the jam sensors Overview 243 4...
Страница 295: ...Install the paper feed unit 4 Troubleshooting 294 4...
Страница 435: ...5 Service Tables 434 5...
Страница 521: ...6 Details 520 6...