Drum Re-installation
1.
Push the development unit to the right
¶
.
2.
While continuing to hold the unit to the right, push it into the machine.
3.
Confirm that the pin [A] goes into the left side of the oval hole [B] in the development unit
plate.
4.
Push the development unit in completely
·
until it stops, then push it to the left
¸
.
5.
Make sure you can see the horizontal pin in front of the plate as shown below.
• If you cannot move the development unit plate behind the horizontal pin, turn the front gear of
the unit to the left and try again.
• Make sure the pipeline shutter is rotated down to the open position.
6.
Reattach all removed parts.
Drum Unit
147
3
Содержание G148
Страница 1: ...Model MT P2 Machine Code G148 SERVICE MANUAL 23 June 2006 Subject to change...
Страница 52: ...10 Clamp 1 LCT B473 51 1...
Страница 67: ...Installation Unplug the machine power cord before starting the following procedure 1 Installation 66 1...
Страница 68: ...1 Unpack the finisher and remove all tapes and shipping retainers 3000 Sheet Finisher SR842 B706 67 1...
Страница 94: ...16 Set the hopper 13 in its holder Punch Unit B702 93 1...
Страница 129: ...2 Preventive Maintenance 128 2...
Страница 163: ...1 Open the front door 2 Pull out the internal dust filter A 3 Replacement and Adjustment 162 3...
Страница 172: ...4 Development motor bracket D x 3 x 1 5 Development motor E x 4 Development Unit 171 3...
Страница 207: ...3 Remove the left tandem tray D x 5 4 Right tandem tray E x 2 3 Replacement and Adjustment 206 3...
Страница 237: ...3 Replacement and Adjustment 236 3...
Страница 244: ...Jam Detection Sensor Locations The illustration below shows the locations of the jam sensors Overview 243 4...
Страница 295: ...Install the paper feed unit 4 Troubleshooting 294 4...
Страница 435: ...5 Service Tables 434 5...
Страница 521: ...6 Details 520 6...