12
The modem board could
not enable the NIB.
Replace the modem board.
651
Illegal Remote Service Dial-up
An expected error occurred when Cu-
min-M dialed up the NRS Center.
• Software bug
• No action is required because only the
count is logged
670
D
Engine startup error
The machine engine, controlled by the
BICU (Base Image Control Unit), was
operating incorrectly when the ma-
chine was switched on or returned to
normal operation from the energy save
mode.
• Check the connections between BICU and
controller
• BICU defective
• Controller board defective
• PSU defective
672
B
Controller startup error
After power on, the line between the
controller and the operation panel did
not open for normal operation.
After normal startup, communication
with the controller stopped.
• Controller stalled
• Controller installed incorrectly
• Controller board defective
• Operation panel harness disconnected or
defective
SC700: Peripherals
720
D
Finisher transport motor error
The encoder pulse of the finisher trans-
port motor does not change state
(high/low) within 600 ms and does not
change after 2 retries.
• Finisher transport motor defective
• Transport motor harness disconnected, or
defective
• Finisher main board defective
721
B
Finisher jogger motor error
Service Mode
265
4
Содержание G148
Страница 1: ...Model MT P2 Machine Code G148 SERVICE MANUAL 23 June 2006 Subject to change...
Страница 52: ...10 Clamp 1 LCT B473 51 1...
Страница 67: ...Installation Unplug the machine power cord before starting the following procedure 1 Installation 66 1...
Страница 68: ...1 Unpack the finisher and remove all tapes and shipping retainers 3000 Sheet Finisher SR842 B706 67 1...
Страница 94: ...16 Set the hopper 13 in its holder Punch Unit B702 93 1...
Страница 129: ...2 Preventive Maintenance 128 2...
Страница 163: ...1 Open the front door 2 Pull out the internal dust filter A 3 Replacement and Adjustment 162 3...
Страница 172: ...4 Development motor bracket D x 3 x 1 5 Development motor E x 4 Development Unit 171 3...
Страница 207: ...3 Remove the left tandem tray D x 5 4 Right tandem tray E x 2 3 Replacement and Adjustment 206 3...
Страница 237: ...3 Replacement and Adjustment 236 3...
Страница 244: ...Jam Detection Sensor Locations The illustration below shows the locations of the jam sensors Overview 243 4...
Страница 295: ...Install the paper feed unit 4 Troubleshooting 294 4...
Страница 435: ...5 Service Tables 434 5...
Страница 521: ...6 Details 520 6...