9.
Attach the upper guide [10] (
x2).
10.
Attach the lower guide [11] (
x2).
• The upper guide must be attached before the lower guide. Make sure the guides are positioned
correctly so that they do not interfere with paper feed and mark the sheets with creases.
11.
Replace the right cover of the LCT (
x2).
Installing the LCT
1. Installation
56
1
Содержание G148
Страница 1: ...Model MT P2 Machine Code G148 SERVICE MANUAL 23 June 2006 Subject to change...
Страница 52: ...10 Clamp 1 LCT B473 51 1...
Страница 67: ...Installation Unplug the machine power cord before starting the following procedure 1 Installation 66 1...
Страница 68: ...1 Unpack the finisher and remove all tapes and shipping retainers 3000 Sheet Finisher SR842 B706 67 1...
Страница 94: ...16 Set the hopper 13 in its holder Punch Unit B702 93 1...
Страница 129: ...2 Preventive Maintenance 128 2...
Страница 163: ...1 Open the front door 2 Pull out the internal dust filter A 3 Replacement and Adjustment 162 3...
Страница 172: ...4 Development motor bracket D x 3 x 1 5 Development motor E x 4 Development Unit 171 3...
Страница 207: ...3 Remove the left tandem tray D x 5 4 Right tandem tray E x 2 3 Replacement and Adjustment 206 3...
Страница 237: ...3 Replacement and Adjustment 236 3...
Страница 244: ...Jam Detection Sensor Locations The illustration below shows the locations of the jam sensors Overview 243 4...
Страница 295: ...Install the paper feed unit 4 Troubleshooting 294 4...
Страница 435: ...5 Service Tables 434 5...
Страница 521: ...6 Details 520 6...