background image

Series 

BVA/F, BVAP/F to ASME

 

 

Page 

3

 

 
 

9520-036-en 

Revision 19 

TM 10477

 

Edition    05/2022 

Relevant documents 

  EG-Declaration of conformity  

  Declaration of conformity FDA & 97/48/EG 

  Manufacturer 

Declaration 

ATEX 

Directive 

2014/34/EU 

  Manufacturer Declaration TA-Luft 

  Form  for  Safety  Information  Concerning  the 

Contamination QM 0912-16-2001_en 

  For BVAP/F : Operating manual for actuator 

  Depending on option, relevant drawing: 

Lever elevation  

Sect.  

9520-00-3009

 

 

Dim. 

9520-00-4009

 

Limit switch IFM  

Sect.  

9520-00-3005

 

 

Dim. 

9520-00-4015

 

Spring return unit 

Sect. 

9520-00-3004

 

 

Dim. 

9520-00-4014

 

Limit switch VDE/VDI    

Sect. 

9520-00-3006

 

 

Dim. 

9520-00-4016

 

Initiator Turck  

Sect. 

9520-00-3007

 

 

Dim. 

9520-00-4017

 

Locking plate 

 

9520-00-3002

 

Connecting dimensions for actuatorDim. 

9520-00-4179

 

 
 
 

Technical data 

Manufacturer: 

Richter Chemie-Technik GmbH 
Otto-Schott-Str. 2 
D-47906 Kempen 
Telephone :  +49 (0) 2152 146-0 
Fax: 

+49 (0) 2152 146-190 

E-Mail :  

[email protected]

 

Internet:  

http://www.richter-ct.com

 

Designation : 

Standard  ball  valve  with  one-piece  ball/stem  unit  or 
ceramic  ball  and  stem,  with  plastic  coating,  cone 
shape  stem  sealing,  seat  rings  of  pure  PTFE,  cavity 
reduced as standard feature, twopiece body. 

Series: 

BVA/F

  

  Version  with  lockable  lever  or  hand 

gear 

BVAP/F

 

  Design  prepared  for  pneum.,  hydr.  or 

electric actuator to ISO 5211 

Certified to Clean Air Act (TA Luft) 

Strength  and  tightness  (P10,  P11)  of  the  pressure-
bearing body tested to DIN EN 12266-1. 

Gas-tight (P12) in the seat  to DIN EN 12266-1,  
leak rate A 

MSS SP 25  Standard Marking System 

MSS SP 72  General Service 

API 598   Valve Inspection and Testing 

The  tests  at  Richter  fulfils  the  requirements 
of  API  598  on  principle.  However  this 
standard  contains  optional,  additional  tests. 
These  tests  are  not  object  of  the  tests  at 
Richter  and  have  to  be  arranged  by  order 
with  Richter  (e.g.  point  3.3:  High  Pressure 
Closure Test). 

Face to face: 

ASME B16.10, Class 150 column 19 

Flange connecting dimensions:  
ASME B16.5 Class 150, raised face. 

Materials : 

Body material:  
Ductile cast iron ASTM A395 

Lining material:  

PFA/PTFE 

.../F  

Temperature range : 

See pressure-temperature diagram in Section 1.5. 

Operating pressure: 

From vacuum to max.250 psig  (17.2 bar) 
See pressure-temperature diagram in Section 1.5. 

Ball vale sizes in inch: 

1“, 2“ with full port

 

1½“, 3“, 4“, 6” with 

reduced port 

Installation position : 

Arbitrary, with an additional relief bore in the ball/stem 
units  or  ceramic  balls  a  direction  arrow  indicates  the 
direction of flow. 
See Section 6.3. 

Weight, ball valve manually operated: 

 

Nomi-

nal size 

1“

 

1½“

 

2“

 

3“

 

4“

 

6“

 

ca. kg  

10.8 

13 

17 

36 

53 

ca. lbs 

11 

24 

28.5  37.5 

79 

117 

 

For weight of actuator, see actuator manufacturer's 
manual. 

Dimensions and individual parts : 

See sectional drawing in Section 10 

Wear parts : 

Seat rings

 

 

stem seal 

 

Ball/stem unit 

 

Ball and stem 

Содержание BVA/F Series

Страница 1: ...t installation operation and maintenance Subject to change without notice Reproduction is generally permitted with indication of the source Richter Chemie Technik GmbH 9520 036 en Revision 19 Edition...

Страница 2: ...3 Shutdown 10 8 Malfunctions 10 9 Maintenance 11 9 1 Dismantling 11 9 1 1 BVA F with lever 11 9 1 2 Ball valve with actuator 11 9 2 Assembly BVA F BVAP F with ball stem unit 11 9 2 1 Packing insert 1...

Страница 3: ...tric actuator to ISO 5211 Certified to Clean Air Act TA Luft Strength and tightness P10 P11 of the pressure bearing body tested to DIN EN 12266 1 Gas tight P12 in the seat to DIN EN 12266 1 leak rate...

Страница 4: ...ighten in diametrically opposite sequence The tightening torques for pipe screws and body screws mentioned must not be exceeded For an exception see Section 8 Flange connection valve pipe is leaking T...

Страница 5: ...6 red 708 708 814 1062 4425 Al2O3 ceramic ball DN p in psi 45 85 145 250 max adm inch in lbs in lbs in lbs in lbs in lbs 1 1 red 89 89 89 106 283 2 221 221 221 266 1060 3 red 221 221 221 266 1060 4 re...

Страница 6: ...ED for the passage and shut off of fluids The valves are suitable for vapours gases and non boiling liquids of group 1 according to the PED and have a corrosion resistant plastic lining Solids can lea...

Страница 7: ...t be prevented e g by superimposing a layer of nitrogen It is recom mended to wait 1 hour before removing the valve from the plant in order to permit the elimination of static peak charges This means...

Страница 8: ...e valve must be protected against impacts and collisions Directly after receipt of the goods the consignment must be checked for completeness and any in transit damage Do not damage paint protection 5...

Страница 9: ...special accessories in the Richter range 6 2 Grounding The valve must be grounded This can be achieved in the simplest way via the pipe screws using tooth lock washers One pipe screw per flange is und...

Страница 10: ...Prior to undoing the flange connection ensure that the plant is depressurised and emptied Prior to starting any repair work the valve is to be thoroughly cleaned Medium residue may be in the valve eve...

Страница 11: ...dismantling is performed as described in Section 8 1 1 9 2 Assembly BVA F BVAP F with ball stem unit Prior to assembly all parts are to be cleaned and the plastic lined parts checked for damage Inser...

Страница 12: ...d bolts Remove ball 200 from the main body 101 by swivelling it Press the stem 202 downwards into the body and remove base ring 422 9 3 3 BVAP F with actuator Mount actuator 850 with coupling 804 Dism...

Страница 13: ...at right angles to the direction of flow Mount coupling 804 and actuator 850 Observe the actuator position in accordance with the actuator operating manual 9 5 Conversion from lever to actuator Select...

Страница 14: ...05 1 thrust ring 422 base ring 423 packing insert 502 spring gland follower 503 spring gland follower 510 bracket 554 1 washer 557 grounding spring washer 577 lever stop 804 coupling includes 500 ring...

Страница 15: ...to ASME Page 15 9520 036 en Revision 19 TM 10477 Edition 05 2022 10 3 Sectional drawing BVA F 1 to 2 with lever Drawing indicates ball valve with ball stem unit Holes of the flange and housing screws...

Страница 16: ...age 16 9520 036 en Revision 19 TM 10477 Edition 05 2022 10 4 Sectional drawing BVA F 3 to 6 with lever Drawing indicates ball valve with ball stem unit and reduced bore Holes of the flange and housing...

Страница 17: ...Series BVA F BVAP F to ASME Page 17 9520 036 en Revision 19 TM 10477 Edition 05 2022 10 5 View and section Ball valve with lever 10 6 Section ball valve with actuator...

Страница 18: ...ASME Page 18 9520 036 en Revision 19 TM 10477 Edition 05 2022 10 7 Sectional drawing BVAP F 1 to 2 with actuator Drawing indicates ball valve with ball stem unit Holes of the flange and housing screw...

Страница 19: ...e 19 9520 036 en Revision 19 TM 10477 Edition 05 2022 10 8 Sectional drawing BVAP F 3 to 6 with actuator Drawing indicates ball valve with ball stem unit and reduced bore Holes of the flange and housi...

Страница 20: ...with lever DN 1 1 red 2 3 red 4 red 6 red D inch mm 0 96 24 5 1 87 47 5 3 07 78 3 78 96 L inch mm 5 0 127 6 5 165 7 0 178 7 99 203 9 01 229 10 51 267 HL inch mm 7 05 179 10 24 260 16 14 410 20 27 515...

Страница 21: ...Series BVA F BVAP F to ASME Page 21 9520 036 en Revision 19 TM 10477 Edition 05 2022 10 10 Dimensional drawing BVAP F with actuator...

Страница 22: ...3 78 96 L inch mm 5 0 127 6 5 165 7 0 178 7 99 203 9 01 229 10 51 267 L1 inch mm L2 inch mm L3 inch mm H1 inch mm 1 97 50 3 15 80 4 65 118 5 43 138 H2 inch mm 2 32 60 2 32 60 3 15 80 3 94 100 H3 inch...

Страница 23: ......

Страница 24: ......

Страница 25: ......

Страница 26: ...848 1 vom T V S d Industrie Service GmbH Voraussetzung f r die G ltigkeit der Herstellererkl rung ist das Beachten und Einhalten der Betriebsanleitung meet the requirement of the leakage rate La s 10...

Страница 27: ...ls The laws are such as the Health and Safety at Work Act ArbSt ttV the Ordinance on Harzadous Substances GefStoffV BIOSTOFFV the procedures for the prevention of accidents as well as regulations to e...

Страница 28: ...tamination of the pumps valves and component sent in for repair On the basis of this information for the contractor is it possible to meet the necessary preventive action during the execution of the r...

Страница 29: ...ch cleaning method radioactive3 1 if no then forward to D other pollutant 2 Aggregates which are contaminated with microbiological or explosive substances are only accepted with documented evidence of...

Страница 30: ...ai Info idexcorp com Internet www richter ct com Richter Pumps Valves Inc 406 State Street Cedar Falls 50613 IA USA Tel 1 319 268 8038 Fax 1 319 273 8157 Email RichterCedarFalls Info idexcorp com Inte...

Отзывы: