Series
BVA/F, BVAP/F to ASME
Page
13
9520-036-en
Revision 19
TM 10477
Edition 05/2022
9.4.3 BVAP/F with actuator
♦
Mount spring gland follower
502
(at 4" and 6" are
2 spring gland followers
502
) and packing gland
follower
503
. Tighten packing nuts until there is
no gap between packing gland follower and
spring gland follower. See
Sections 1.2, 9.6 and
9.8
.
♦
Mount bracket
510
with the opening at right
angles to the direction of flow.
♦
Mount coupling
804
and actuator
850
. Observe
the actuator position in accordance with the
actuator operating manual.
9.5 Conversion from lever to
actuator
♦
Select the actuator in accordance with the
instructions of the actuator manufacturer.
♦
Remove lever
203
.
♦
Remove lever stop
577
and plug.
♦
Check the fits of the coupling
804
, bracket
510
and actuator
850
.
♦
Mount bracket
510
with the opening at right angles
to the direction of flow.
♦
Mount coupling
804
and actuator
850
. Observe
the actuator position in accordance with the actua-
tor operating manual.