background image

Richter

= Richter Chemie-Technik GmbH; IDEX

= IDEX Corporation

Richter Chemie-Technik GmbH
Otto-Schott-Str. 2
D-47906 Kempen / Germany
Tel: +49 (0) 2152 146-0
Fax: +49 (0) 2152 146-190
Email: [email protected]
Internet: www.richter-ct.com

Richter (EP), Nanjing, Shanghai Office
Room 3502 - 3504, Zhaofeng Plaza
No. 1027, Changning Road, Shanghai 200050 / China
Tel: +86 / 21 / 6150 - 9812
Fax: +86 / 21 / 5241 - 2870
Email: [email protected]
Internet: www.richter-ct.com

Richter Pumps & Valves, Inc.
406 State Street,
Cedar Falls 50613, IA / USA
Tel.: +1 / 319 / 268 - 8038
Fax: +1 / 319 / 273 - 8157
Email: [email protected]
Internet: www.richter-inc.com

Richter Pumps & Valves Pvt. Ltd.
Suntech Centre, 37-40, Subhash Road
Vile Parle East, Mumbai 400057 / India
Tel: +91 / 22 / 287 94 610
Fax: + 91 / 22 / 287 94 680
Email: [email protected]
Internet: www.richter-ct.com

© Richter Chemie-Technik GmbH 2022

Edition 09/2022

Subject to change without notice.

Revision 2.0

These installation and operating instructions must be kept!

9520B036-en

Richter

=

Richter

Chemie-

Technik

GmbH;

IDEX

=

IDEX

Corporation

Richter

=

Richter

Chemie-

Technik

GmbH;

IDEX

=

IDEX

Corporation

Richter

=

Richter

Chemie-

Technik

GmbH;

IDEX

=

IDEX

Corporation

Содержание BVA/F Series

Страница 1: ...t installation operation and maintenance Subject to change without notice Reproduction is generally permitted with indication of the source Richter Chemie Technik GmbH 9520 036 en Revision 19 Edition...

Страница 2: ...3 Shutdown 10 8 Malfunctions 10 9 Maintenance 11 9 1 Dismantling 11 9 1 1 BVA F with lever 11 9 1 2 Ball valve with actuator 11 9 2 Assembly BVA F BVAP F with ball stem unit 11 9 2 1 Packing insert 1...

Страница 3: ...tric actuator to ISO 5211 Certified to Clean Air Act TA Luft Strength and tightness P10 P11 of the pressure bearing body tested to DIN EN 12266 1 Gas tight P12 in the seat to DIN EN 12266 1 leak rate...

Страница 4: ...ighten in diametrically opposite sequence The tightening torques for pipe screws and body screws mentioned must not be exceeded For an exception see Section 8 Flange connection valve pipe is leaking T...

Страница 5: ...6 red 708 708 814 1062 4425 Al2O3 ceramic ball DN p in psi 45 85 145 250 max adm inch in lbs in lbs in lbs in lbs in lbs 1 1 red 89 89 89 106 283 2 221 221 221 266 1060 3 red 221 221 221 266 1060 4 re...

Страница 6: ...ED for the passage and shut off of fluids The valves are suitable for vapours gases and non boiling liquids of group 1 according to the PED and have a corrosion resistant plastic lining Solids can lea...

Страница 7: ...t be prevented e g by superimposing a layer of nitrogen It is recom mended to wait 1 hour before removing the valve from the plant in order to permit the elimination of static peak charges This means...

Страница 8: ...e valve must be protected against impacts and collisions Directly after receipt of the goods the consignment must be checked for completeness and any in transit damage Do not damage paint protection 5...

Страница 9: ...special accessories in the Richter range 6 2 Grounding The valve must be grounded This can be achieved in the simplest way via the pipe screws using tooth lock washers One pipe screw per flange is und...

Страница 10: ...Prior to undoing the flange connection ensure that the plant is depressurised and emptied Prior to starting any repair work the valve is to be thoroughly cleaned Medium residue may be in the valve eve...

Страница 11: ...dismantling is performed as described in Section 8 1 1 9 2 Assembly BVA F BVAP F with ball stem unit Prior to assembly all parts are to be cleaned and the plastic lined parts checked for damage Inser...

Страница 12: ...d bolts Remove ball 200 from the main body 101 by swivelling it Press the stem 202 downwards into the body and remove base ring 422 9 3 3 BVAP F with actuator Mount actuator 850 with coupling 804 Dism...

Страница 13: ...at right angles to the direction of flow Mount coupling 804 and actuator 850 Observe the actuator position in accordance with the actuator operating manual 9 5 Conversion from lever to actuator Select...

Страница 14: ...05 1 thrust ring 422 base ring 423 packing insert 502 spring gland follower 503 spring gland follower 510 bracket 554 1 washer 557 grounding spring washer 577 lever stop 804 coupling includes 500 ring...

Страница 15: ...to ASME Page 15 9520 036 en Revision 19 TM 10477 Edition 05 2022 10 3 Sectional drawing BVA F 1 to 2 with lever Drawing indicates ball valve with ball stem unit Holes of the flange and housing screws...

Страница 16: ...age 16 9520 036 en Revision 19 TM 10477 Edition 05 2022 10 4 Sectional drawing BVA F 3 to 6 with lever Drawing indicates ball valve with ball stem unit and reduced bore Holes of the flange and housing...

Страница 17: ...Series BVA F BVAP F to ASME Page 17 9520 036 en Revision 19 TM 10477 Edition 05 2022 10 5 View and section Ball valve with lever 10 6 Section ball valve with actuator...

Страница 18: ...ASME Page 18 9520 036 en Revision 19 TM 10477 Edition 05 2022 10 7 Sectional drawing BVAP F 1 to 2 with actuator Drawing indicates ball valve with ball stem unit Holes of the flange and housing screw...

Страница 19: ...e 19 9520 036 en Revision 19 TM 10477 Edition 05 2022 10 8 Sectional drawing BVAP F 3 to 6 with actuator Drawing indicates ball valve with ball stem unit and reduced bore Holes of the flange and housi...

Страница 20: ...with lever DN 1 1 red 2 3 red 4 red 6 red D inch mm 0 96 24 5 1 87 47 5 3 07 78 3 78 96 L inch mm 5 0 127 6 5 165 7 0 178 7 99 203 9 01 229 10 51 267 HL inch mm 7 05 179 10 24 260 16 14 410 20 27 515...

Страница 21: ...Series BVA F BVAP F to ASME Page 21 9520 036 en Revision 19 TM 10477 Edition 05 2022 10 10 Dimensional drawing BVAP F with actuator...

Страница 22: ...3 78 96 L inch mm 5 0 127 6 5 165 7 0 178 7 99 203 9 01 229 10 51 267 L1 inch mm L2 inch mm L3 inch mm H1 inch mm 1 97 50 3 15 80 4 65 118 5 43 138 H2 inch mm 2 32 60 2 32 60 3 15 80 3 94 100 H3 inch...

Страница 23: ......

Страница 24: ......

Страница 25: ......

Страница 26: ...848 1 vom T V S d Industrie Service GmbH Voraussetzung f r die G ltigkeit der Herstellererkl rung ist das Beachten und Einhalten der Betriebsanleitung meet the requirement of the leakage rate La s 10...

Страница 27: ...ls The laws are such as the Health and Safety at Work Act ArbSt ttV the Ordinance on Harzadous Substances GefStoffV BIOSTOFFV the procedures for the prevention of accidents as well as regulations to e...

Страница 28: ...tamination of the pumps valves and component sent in for repair On the basis of this information for the contractor is it possible to meet the necessary preventive action during the execution of the r...

Страница 29: ...ch cleaning method radioactive3 1 if no then forward to D other pollutant 2 Aggregates which are contaminated with microbiological or explosive substances are only accepted with documented evidence of...

Страница 30: ...ai Info idexcorp com Internet www richter ct com Richter Pumps Valves Inc 406 State Street Cedar Falls 50613 IA USA Tel 1 319 268 8038 Fax 1 319 273 8157 Email RichterCedarFalls Info idexcorp com Inte...

Отзывы: