11
Revision 2
Step 2 - Motor Pad Footing (Minimum Requirement):
•
The motor pad concrete footing requires an area of no less than 450mm long x
300mm wide and a minimum depth of 200mm (Standard requirement).
•
Ensure surface is level and parallel to the driveway.
•
Concrete pad should be min 20-25MPA
(Rapid Set Concrete not recommended) allow
to cure for 7-10 days before drilling and securing the mounting plate into position.
Mounting Plate Dimensions:
Step 3 - Motor Position Installation:
•
Insert the key and open the manual release bar to put the motor into manual
mode, and check that the motor cog rotates freely by hand (As per Fig 16).
•
Place the motor and motor mounting plate on the concrete pad.
•
Make sure the distance between the gate motor cog and gear rack position are
aligned (see Fig 4)
•
Mark all four outside corners of the mounting plate on the concrete pad using a
pencil, chalk or similar, to ensure the mounting plate is in the correct position
before drilling.
•
Remove motor from the mounting plate.
Fig 3
When mounting and
positioning the motor
ensure that the power
cable is unplugged.
The motor cover will
need to be removed to
mount the motor to the
mounting plate.