GTR207 Installation Manual:
Rev 1b
10
Step 1 - Gate Preparation Before Adding
Your Sliding Gate Motor:
• Ensure that the sliding gate is correctly installed.
• The gate is horizontal and level and the gate can glide back and forth smoothly when moved by hand
before installing the Automatic Gate Opener.
• Wheels and guide rollers should rotate easily and be free from dirt/grime.
•
Track should be flat, level and firmly affixed.
•
Any misalignment in the gate will affect performance of the automatic gate opener.
The gate should slide smoothly by hand before attempting to install the gate opener.
Please ensure that the motor power cable is not plugged in at any stage before Step 9
Please Note:
The warning signage
provided (Part 6)
must be displayed on
the street facing side
of your automatic
gate at all times.