Before the weigh module wiring can be completed, all load cell cables have to be routed through the conduit beginning at the
load cell outlet. Use the following steps to route load cell cables through conduit to the junction box.
1. Mark each load cell cable at the end to help identify each load cell before routing load cell cables.
2. Carefully make a loop in the flex conduit and position the end of the flex conduit close to the end of the rigid conduit.
Figure 5-3. Load Cell Pocket Conduit Installed
3. Working from the junction box end, insert a fish tape or similar tool and pull each load cell cable through the rigid
conduit until all excess cable is taken in.
4. When all of the load cell cable is pulled through, insert the end of the flex conduit over the end of the rigid conduit and
tighten fitting.
5. Wire each load cell to the junction box terminal strip in accordance with the wiring code contained in the Certificate of
Conformance.
Load cell cable may be cut for best fit. Standard warranty will not be affected.
Figure 5-4. Junction Box Pocket
Figure 5-5. Conduit Connection Between Deck Modules
Note
Содержание SURVIVOR OTR Series
Страница 1: ...SURVIVOR OTR Flattop Truck Scale Installation Manual PN 53831 Rev F May 29 2020...
Страница 35: ......