Installation
©
Rice Lake Weighing Systems
●
All Rights Reserved
7
7. Install the 3/8-16 x 2-1/2 inch bolts through the outer and inner width adjustment channel and tubing spacers.
8. Attach the lock washer and nut to secure the bolt.
Ensure bolts are placed at the overlapping left and right extremes with the others equally between.
Each weigh stand must have 4 bolts installed in the width channel. See
.
Figure 2-2. Width Bolt and Tubing Spacer Installation
9. Repeat the width adjustment steps for each weigh stand.
2.5 Height Adjustment
The height of the weigh stands needs to be adjusted within an inch less than the needed height of the weigh stands and the
existing conveyor. The provided shims allow the weigh stands to be adjusted to the needed height within a 1/16 of an inch. See
for shim adjustment.
1. Loosen the load cell cable mounting clips.
2. Measure the height of the old conveyor legs that the weigh stands are replacing.
3. Remove the four 3/8-16 x 1 inch bolts from the weigh stand mounts. See
4. Adjust the weigh stand mounts to the 1-inch increments below desired height.
The height assembly can be adjusted in 1-inch increments. Shims provide height adjustment within 1/16 of an inch.
5. Insert the 3/8-16 x 1 inch bolts (that were removed in
) through the weigh stand mount height channel.
IMPORTANT
Tubing Spacer
Note
Содержание ELS Series
Страница 1: ...ELS Series Elevated Load Cell Stands Installation Manual PN 213042 Rev A April 27 2022 ...
Страница 29: ......