Installation
©
Rice Lake Weighing Systems
●
All Rights Reserved
9
4. Install a 3/8-16 x 2-1/2 inch bolts, washers and nuts from the parts kit through the ends of the support braces and the
weigh stands.
Figure 2-4. Support Brace Stand Attachment
The support braces must be installed to the weigh stands so they are touching both the height and width
channels.
5. Adjust the length for the weigh stands and support braces to the measured length.
6. See
to install the conveyor at this time.
7. Mark drill hole locations on the inner adjustable tubing using provided holes from outer adjustable tubing as a guide.
8. Drill 7/16 inch holes through the inner adjustable tubing.
9. Install two 3/8-16 x 2-1/2 inch bolts provided from the parts kit through holes created for the support brace.
Figure 2-5. Support Brace Assembly
Do not exceed a length of 6 feet in length for the support braces.
IMPORTANT
IMPORTANT
Содержание ELS Series
Страница 1: ...ELS Series Elevated Load Cell Stands Installation Manual PN 213042 Rev A April 27 2022 ...
Страница 29: ......