Installation
©
Rice Lake Weighing Systems
●
All Rights Reserved
11
2.7 Conveyor Installation
The ELS weigh stands have three holes and two slots on the top of each mounting plate to accommodate existing hole patterns
on the conveyor channel. Before drilling through the conveyor channel, assess the usage of any existing holes when installing
the conveyor onto the mount plates.
1. Set the existing conveyor onto the ELS weigh stands with the conveyor channel centered on the mounting plates.
The ELS weigh stands must be 3-6 inches inside the ends of the conveyor to prevent load cell damage.
Figure 2-7. Conveyor Placement onto Weigh Stands
2. Align the existing conveyor holes to the bolt holes or slots of the mounting plate.
Two bolts must be used per mounting plate, utilizing one option from each end of the mounting plate.
3. Drill holes through the conveyor channel, if needed, to have two attachment points per mounting plate.
4. Install the bolts from the previous conveyor stands through the conveyor channel and the mounting plate.
Figure 2-8. Conveyor Installation onto Mounting Plate
for installing the conveyor on each mounting plate.
6. See
to finish installing the support braces
IMPORTANT
Note
Содержание ELS Series
Страница 1: ...ELS Series Elevated Load Cell Stands Installation Manual PN 213042 Rev A April 27 2022 ...
Страница 29: ......