Elevated Load Cell Stands
22
Visit our website
3.2 Load Cell Replacement
Replacement load cells can be ordered from Rice Lake Weighing Systems, please refer to the replacement parts section. See
1. Brace the conveyor using proper equipment.
2. Loosen the load cell cable mounting clips.
3. Open the junction box and disconnect defective load cell cable.
4. Remove the load cell guard plate.
5. Remove the four 5/16-18 x 3/4 inch bolts that connect the bearing block to the conveyor mounting plate.
Figure 3-2. Conveyor Mounting Plate Removal
6. Remove the two 1/2-20 x 2-1/2 inch bolts that connect the load cell, load cell spacer and the load cell mount plate.
Figure 3-3. Load Cell Removal
7. Remove the load cell and the bearing block.
Bearing Block
Conveyor Mounting
Plate
Conveyor
Load Cell Spacer
Load Cell
Содержание ELS Series
Страница 1: ...ELS Series Elevated Load Cell Stands Installation Manual PN 213042 Rev A April 27 2022 ...
Страница 29: ......