background image

Form I-XE/CRGB/RPB, Page 2

1. Approval and Installation Codes

The models covered in this manual are design certified or approved duct
furnaces that are factory assembled with air handing components, creat-
ing a unified packaged furnace/blower system. The packaged system
models listed on page 1 are design-certified to ANSI and CSA Standards
by the Canadian Standards Association. All models are approved for
installation in the United States. All models except Model CRGB and
Model HCRGB are approved for installation in Canada. All furnaces are
approved for use with either natural gas or propane. The type of fuel for
which the furnace is equipped and the correct firing rate are shown on
the rating plate attached to the unit. Electrical characteristics are shown
on both the motor nameplate and the unit rating plate.

These units must be installed in accordance with local building codes. In
the absence of local codes, in the United States, the unit must be in-
stalled in accordance with the National Fuel Gas Code NFPA54/ANSI
Z223.1 (latest edition). A Canadian installation must be in accordance
with the CSA B149.1 Natural Gas and Propane Installation Code. These
codes are available from CSA Information Services, 1-800-463-6727.
Local authorities having jurisdiction should be consulted before installa-
tion is made to verify local codes and installation procedure require-
ments.

Special Installations (Aircraft Hangars/Garages)

Installations in aircraft hangars should be in accordance with NFPA No.
409 (latest edition), Standard for Aircraft Hangars; in public garages in
accordance with NFPA No. 88A (latest edition), Standard for Parking
Structures; and for repair garages in accordance with NFPA No. 88B
(latest edition), Standard for Repair Garages. In Canada, installations in
aircraft hangars should be in accordance with the requirements of the
enforcing authorities, and in public garages in accordance with CSA
B149.1 codes.

WARNING: To ensure safety, follow the lighting
instructions located on the outlet box cover plate
in the heater section of the packaged furnace
assembly.

HAZARD INTENSITY LEVELS

used for Warnings in this Manual

1. DANGER: Failure to comply will result in

severe personal injury or death and/or
property damage.

2. WARNING: Failure to comply could result in

severe personal injury or death and/or
property damage.

3. CAUTION: Failure to comply could result in

minor personal injury and/or property dam-
age.

WARRANTY: Warranty is void if......

a. Packaged furnaces are used in atmospheres containing

flammable vapors or atmospheres containing
chlorinated or halogenated hydrocarbons or any
contaminant (silicone, aluminium oxide, etc.) that
adheres to the spark ignition flame sensing probe.

b. Wiring is not in accordance with the diagram furnished

with the heater.

c. Unit is installed without proper clearances to

combustible materials or without proper ventilation and
air for combustion. (See Paragraphs 5 and 6.)

d. Furnace air throughput is not adjusted within the range

specified on the rating plate.

3. Uncrating and Preparation

This furnace was test operated and inspected at the factory prior to
crating and was in operating condition. If the equipment has incurred
any damage in shipment, document the damage with the carrier and
contact your Reznor distributor.

Check the rating plate for the gas specifications and electrical character-
istics of the furnace to be sure that they are compatible with the gas and
electric at the installation site. Read this booklet and become familiar
with the installation requirements of your particular model. If you do
not have knowledge of local requirements, check with the local gas
company or any other local agencies who might have requirements
concerning this installation. Before beginning, make preparations for
necessary supplies, tools, and manpower.

Check to see if there are any field-installed options that need to be
assembled to the furnace prior to installation.

Option Parts

 - Some gas control options will have parts either shipped

loose with the heater or shipped separately. If your unit is equipped
with any of the following gas control options, be sure these parts are
available at the job site.

Other shipped-separate options could include a roof curb, a cooling coil
cabinet, a screened outside air hood, a gas shutoff valve, a condensate
drain fitting, a thermostat, a different control switch, a power venter, a
remote console, a manual fan switch, a vertical vent terminal, a gas
supply regulator, and/or a disconnect switch. Or, if equipped with an
optional evaporative cooling module, a water hammer arrestor or fill and
drain or freeze kit could be shipped separately.

Heating -- Gas

Option AG7

Control Option

  Thermostat, P/N 48033

Makeup Air --

Option AG3, AG6, AG8 or AG13

Gas Control

   Control Switch, P/N 29054

Options

Option AG9

  Remote Temperature Selector, P/N 48042

(If an optional

  Control Switch, P/N 29054

remote console

Option AG15

is ordered, the

  Remote Temperature Selector, P/N 115848

control switch

  Stage Adder M odule, P/N 115849

is mounted on

  Control Switch, P/N 29054

the console.)

Option AG16

  Remote Temperature Selector, P/N 115848
  Stage Adder M odule, P/N 115849
  Remote Display M odule, P/N 115852
  Control Switch, P/N 29054

Option AG39

  Remote Temperature Selector, P/N 174849

2. Warranty

Refer to limited warranty information on the warranty card in the
"Owner's Envelope".

Содержание CRGB Series

Страница 1: ...AquaSaver Timer Adjustment 34 Belts 24 Blocked Vent Switch 25 Blower Motors 24 Blower Rotation 24 Burner Air Adjustment 30 Burner Rack Removal 42 Burners 29 Carryover System 29 Check Installation and...

Страница 2: ...rhalogenatedhydrocarbonsorany contaminant silicone aluminium oxide etc that adheres to the spark ignition flame sensing probe b Wiring is not in accordance with the diagram furnished with the heater c...

Страница 3: ...x 19 1 2 495mm Return Air Openings with Optional Cabinet X Hanger Centerline Standard and Optional Blower Cabinet Dimensions inches andmm Gravity Vented Indoor Models XE HXE Gas Connection Natural Pr...

Страница 4: ...side the downturn plenum cabinet For dimensions with downturn plenum cabinet with a cooling coil cabinet see page 6 FIGURE1B Dimensions Outdoor Gravity VentedModel Series CRGB Vent Cap Gas Connection...

Страница 5: ...ottom of cabinet side If system has a cooling coil cabinet add length dimension on page 6 for full system length The two position discharge dampers in Option AQ8 fit in the discharge air opening The d...

Страница 6: ...ownturnPlenumCabinet factoryattachedto either type of Cooling Coil Cabinet Front View DX Coil Cabinet with Horizontal Discharge Option AU3 Liquid Line Connections 7 8 or 1 3 8 5 1 8 130 8 203 3 4 19 3...

Страница 7: ...r from inside the building openings 1 square inch free area per 1000 BTUH Never less than 100 square inches free area for each open ing See 1 in FIGURE 2 2 Air from outside through duct openings 1 squ...

Страница 8: ...the pipe hanger to a 1 threaded pipe See the suspension method on the left in FIGURE 4 As an alternative method the factory installed pipe hanger may be removed and the heater suspended as illustrated...

Страница 9: ...lled 1 Position curb cross rails and curb side rails as illustrated in FIGURE 8 page 10 If there are two side pieces to a side fasten them with splice plates and hardware as illustrated in the splicin...

Страница 10: ...e is horizontal If the system has an AU11 AU12 AU13 AU14 cooling coil cabinet there is a downturn plenum with vertical discharge Options AU2 AU3 AU11 AU12 AU13 and AU14 are not factory installed Optio...

Страница 11: ...should be supported every six feet 1 8M using a non combustible material such as strap steel or chain Do not rely on the drafthood or heater for support of either horizontal or vertical vent pipe 6 V...

Страница 12: ...re horizontal venting is required or where negative building pressure inhibits gravity venting in stall an optional power venter Option CA Use only a power venter provided by the furnace manufacturer...

Страница 13: ...mmended size is 1 2 x1 2 20 gauge FIGURE11B InstallationoftheVentCap includedinthe optionpackage andthefield suppliedPipingandSupports Oval Adapter Assy PN 103025 Venter Seal Plate P N 43446 9 Condens...

Страница 14: ...air duct should come in con tact with masonry walls Insulate around all air duct through ma sonry walls with not less than 1 2 1 is recommended of insula tion Through Unheated Space Insulate all expo...

Страница 15: ...l connections are made disconnect the pilot supply at the control valve and bleed the system of air Reconnect the pilot line and leak test all connections by brushing on a soap solution WARNING All co...

Страница 16: ...ding MUST be made in accordance with the National Electric CodeANSI NFPANo 70 latest edition or in Canada the Canadian Electrical Code Part I C S A Standard C22 1 In addition the installer should be a...

Страница 17: ...ontrols available as part of the gas and air control options Check the wiring diagram and literature supplied with the unit for operation of factory installed optional controls See FIGURE 19 for locat...

Страница 18: ...ND BLOWER MOTOR BRANCH CIRCUIT WIRE SHOULD BE SIZED TO TEMPERATURE RATING OF AT LEAST 105 C EXCEPT FOR MUST BE REPLACED IT MUST BE REPLACED WITH WIRING MATERIAL HAVING A 4 CAUTION IF ANY OF THE ORIGIN...

Страница 19: ...W LEADS CAP RED 8 USE 18 GA WIRE FOR 24 VOLT CONTROL WIRING ON UNIT NONE NOTES 4 CAUTION IF ANY OF THE ORIGINAL WIRE AS SUPPLIED WITH THE APPLIANCE MUST BE REPLACED IT MUST BE REPLACED WITH WIRING MAT...

Страница 20: ...L WIRE AS SUPPLIED WITH THE APPLIANCE 3 DOTTED WIRING AND THE FOLLOWING CONTROLS ARE SUPPLIED AND INSTALLED 2 THE FOLLOWING CONTROLS ARE SUPPLIED AS OPTIONAL EQUIPMENT 1 THE FOLLOWING CONTROLS ARE SUP...

Страница 21: ...N IF ANY OF THE ORIGINAL WIRE AS SUPPLIED WITH THE APPLIANCE 3 DOTTED WIRING AND THE FOLLOWING CONTROLS ARE SUPPLIED AND INSTALLED 2 THE FOLLOWING CONTROLS ARE SUPPLIED AS OPTIONAL EQUIPMENT 1 THE FOL...

Страница 22: ...E SAFETY SWITCH PORTION OF THE CONTROL THE SWITCH ACTION PROVES THE PRESENCE OF THE PILOT FLAME AND ENERGIZED THE A PILOT FLAME ON EACH OPERATING CYCLE THE SENSING PROBE ENERGIZING THE PILOT GAS VALVE...

Страница 23: ...ND ENERGIZES THE MAIN VALVE THE MAIN GAS IGNITES AND THE UNIT FIRES AT LOW RATE 3 ON A CALL FOR HEAT BY THE HIGH STAGE OF THERMOSTAT THE UNIT FIRES AT FULL RATE 4 IF THE FLAME IS EXTINGUISHED DURING M...

Страница 24: ...outlet temperature turn the adjustable half of the pulley outward One turn of the pulley will change the speed 8 10 5 Tighten the setscrew on the flat portion of the pulley shaft 6 Replace the belt an...

Страница 25: ...ing pressure levels off If a restriction or excessive flue length or turns cause the sensing pres sure to become less than the switch setpoint the pressure switch will function to shut off the main bu...

Страница 26: ...e same as the one illustrated 1 Remove the access panel in the ductwork adjacent to the control compartment access panel 2 Element is retained by spring clips 3 Round gasket and metal retaining plate...

Страница 27: ...IGURE24 Signal Conditioner used in Options AG21 and AG40 Carryover Regulator Modulating Valve Single Stage Gas PrimaryGas FlowPressure Switch WhiteLabel 1 1 w c GasFlow PressureSwitch WhiteLabel 1 1 w...

Страница 28: ...per open Is there voltage between Terminal 88 and Terminal 7 Is there voltage between Terminal 4 on ignition permissive relay and Terminal 7 Replace 1 time delay relay Replace ignition permissive rela...

Страница 29: ...6 38mm 79 23 32 18 25mm 7 16 1 16 11mm 1 6 Option AH2 and spark pilot with lockout is Option AH3 NOTE Outdoor units in Canada using propane require lockout Indoor units in U S and Canada using propane...

Страница 30: ...ers cont d INDOOR Gravity Vented Furnace Models XE HXE Natural gas burners are equipped with two flash carryover systems that receive a supply of gas simultaneously with the main burner NOTE A natural...

Страница 31: ...esuppliedwithairforcombustionasrequired by Code and in Paragraph 6A of this heater installation manual MAINTAIN THE VENT SYSTEM IN STRUCTURALLY SOUND AND PROPERLYOPERATINGCONDITION lockout control if...

Страница 32: ...3 Bottom Panel Position the air hood bottom panel so that it is to the inside of the two side panels and above the factory installed support angle Attach to the side panels If the bottom panel does n...

Страница 33: ...ecessary Follow these instructions to field connect the water supply and make neces sary checks and adjustments before operating the cooling module with a lock nut and a sealing gasket Check these fit...

Страница 34: ...ockwise to increase the ON time or counterclockwise to decrease the ON time One complete turn will adjust the cycle by 12 to 14 seconds All Modules Check the reservoir for any water leaks The reservoi...

Страница 35: ...e the water feed line from the downstream side of the ball valve and unscrew the water bleed line barbed hose fitting 3 Force a fresh water supply through the water inlet hose and thoroughly flush the...

Страница 36: ...let DamperOptionsonIndoor ModelsXE HXE FIGURE 41B Location of Controls for30 OutsideAirHood andDamperOptions AR6orAR7 OutdoorModelsonly FIGURE41D Exampleof OutsideAirand Return Air Damper Linkage Damp...

Страница 37: ...w c Heater Filter Size Metal Fillers Size A B C D E F1 F2 75 100 125 20x20 20x20 150 175 20x25 20x25 13 16 13 16 200 225 16x25 16x20 16x25 16x20 250 300 20x25 20x20 20x25 20x20 350 20x25 20x25 20x25...

Страница 38: ...B D D E 25 635mm 20 508mm 20 508mm 25 635mm Size 350 D D D C C Size 400 25 635mm 20 508mm B D Key Filter Code Filter Size A 16 x 20 B 20 x 20 C 16 x 25 D 20 x 25 E 25 x 25 Shaded areas are filter blo...

Страница 39: ...d with op tional discharge dampers the damper motor wires must be connected to the terminal blocks in the furnace electrical compartment If the coil cabinet being installed does not include a downturn...

Страница 40: ...ection remove the center hole plug FIGURE 46H To install side and top fillerpanels remove screws from top corners of both cabinets and the entire row across the cooling coil cabinet Removerowofscrews...

Страница 41: ...or lint accumulation Clean as needed Check the vent system for soundness Replace any parts that do not appear sound Check the wiring for any damaged wire Replace damaged wiring See Paragraph 12 for re...

Страница 42: ...ryover systems with air pressure 40 Cleaning the Heat Exchanger To clean the outer surfaces circulating air side of the heat exchanger gain access by removing the inspection panels in the ductwork or...

Страница 43: ...causes 8 Reset lockout by interrupting control at thermostat 9 Faulty combustion air proving switch 9 Replace combustion air proving switch 10 Activated blocked vent switch indoor system 10 Correct ve...

Страница 44: ...AG39 or AG40 see page 28 For replacement parts refer to Form P X XE for indoor units or Form P RG RP RBL for outdoor units Problem Probable Cause Remedy Pump does not run Unit is 1 Electrical connecti...

Отзывы: