![REX RKF 130 Скачать руководство пользователя страница 30](http://html.mh-extra.com/html/rex/rkf-130/rkf-130_general-information-manual_1449159030.webp)
RKF 130
Transport, setup, installation
Page 30 of 128
Version 1.1
•
Preliminary activities
The following work and checks are necessary before the initial operation:
-
Comparison of line voltage and frequency
The details on the machine label and the meter of the power station must match.
Voltage fluctuations must not /- 10%. Greater deviations result in
interferences and early wear. Non-compliance with these regulations nullifies any
guarantee on part of the manufacturer.
-
Checking the rotating direction of the hydraulic pump
Open the roasting piston and start the piston filler. Then actuate the piston lifting or lowering
button. If the roasting piston does not move in the selected direction, the polarity of the
phases in the connection line must be reversed.
Attention: The hydraulic pump should not run in the wrong direction for a
long time otherwise it will get damaged. If it is determined that
the hydraulic pump of the piston filler is running in the incorrect
rotating direction, it must be switched off immediately and the
polarity of the connection line must be reversed.
All the work in the electronic field must be performed only by
trained electricians. Danger of electric shocks and
electroshocks! Danger to life!!!
-
Knee lever positioning
Set the height or distance by loosening the hexagonal screw.
Set the corresponding position and lock it with the hexagonal screw
The knee lever plate is rotatable.
-
Set the desired language
-
Set the local time
-
Check all the work programs
-
Check the functionality of the piston filler
(Refer to chapter 4 Operating the piston filler
-
)