![REX RKF 130 Скачать руководство пользователя страница 101](http://html.mh-extra.com/html/rex/rkf-130/rkf-130_general-information-manual_1449159101.webp)
RKF 130
Operating the piston filler
Version 1.1
Page 101 of 128
4.28
PRODUCTION
•
Starting production
Figure 48: Piston filler control elements
The numbers in brackets refer to Figure 3: Functional elements and their arrangement on the
piston filler, page 23.
The start of the industrial operation of the piston filler takes place as follows:
-
Following the general safety instructions e.g. according to the chapters 1.4 and
-
Fill the product in the roasting cylinder (4) and close the roasting cylinder cover
(10)
Attention: Only use products, which correspond to the requirements as per
chapter 2.2 Use
!