25
en
Topfix
®
VMS
H1
D1
D2
H2
3.3 • Mounting the side channels and box
Slide the side channels over
the mounting bases until they
are at their final position. Se-
cure them lightly in position
by using a 10 mm wrench
(nut DIN985)
➋
Loosen the screw in the pin
on the box. Slide the box
onto the guides and make
sure that the cord runs under
the guide wheels. Then
retighten the screw.
➌
Position the side channels
correctly. Check the equal-
ity of width and diagonals
between the side channels
(D1=D2 and H1=H2). They
must be equal to each other!
That is important for nice
fabric rolling.
Secure them well on the
mounting bases by using
a 10 mm wrench (nut
DIN985).
➍
➎
Lay the cord in the pulley block.
Place the cord following the
direction of the arrow located under the wheel on the pulley
block.
Using the supplied screws DIN 7982 ST3.9 x 16,
mount the pulley block onto the lower side of the side channel
➊
Содержание Topfix VMS
Страница 1: ...Topfix VMS Montageanleitung Installation instructions km h TESTED WARRANTY...
Страница 34: ...34 en Topfix VMS...
Страница 35: ...35 en Topfix VMS...