19
en
Topfix
®
VMS
1 • Required materials
2 • Installing the drilling jig
You need the toolkit case and two stainless steel rods to assemble the drilling jig. These rods are
supplied as standard with every order and each one is 3 m in length.
Cut the stainless steel rods to the required length. These must
be even with the Velux VMS module’s projection.
Using an nr. 3 hex key,
tighten both rods into place
in the stop block.
➊
➋
Plug
Stepped drill
Bit 2 bits
Drilling jig
Stop plate
Toolkit:
➊
➋
➌
➍
➎
➊
➋
➌
➍
➎
Содержание Topfix VMS
Страница 1: ...Topfix VMS Montageanleitung Installation instructions km h TESTED WARRANTY...
Страница 34: ...34 en Topfix VMS...
Страница 35: ...35 en Topfix VMS...