Prior to performing any work,
ensure the equipment is iso-
lated from the voltage supply
and secured to prevent acci-
dental switch-on!
CAUTION
Shutdown
Temporary shutdown
1.
Allow the indoor unit to run for
2 to 3 hours in air circulation
mode or in cooling mode at the
maximum temperature setting
in order to remove any residual
moisture from the unit.
2. Shut down the unit using the
remote control.
3. Switch off the voltage supply to
the unit.
4. Cover the unit as far as pos-
sible with plastic foil in order to
protect it from the influences of
weather.
Permanent
Shutdown
Ensure that equipment and com-
ponents are disposed of in accord-
ance with local regulations, e.g.
through authorised disposal
and recycling specialists or at col-
lection points.
Contact REMKO GmbH & Co. KG
or your contract partner for a list
of specialist companies near you.
Care and maintenance
Regular care and maintenance
serves to ensure trouble-free op-
eration and long service life of the
unit.
Care
■
Ensure the indoor unit and out-
door component are protected
against dirt, mould and other
deposits.
■
Clean the equipment using a
damp cloth. Do not use any
caustic, abrasive or solvent-
based cleaning products. Do
not use a jet of water.
■
Clean the fins on the indoor
unit and outdoor component
prior to long shutdown periods.
Maintenance
■
It is recommended that
you take out a maintenance
contract with an annual service
from an appropriate specialist
firm.
This ensures the operational
reliability of your
equipment!
TIP
Type of task
Checks/Maintenance/Inspections
Commissioning
Monthly
Six-monthly
Yearly
General
•
•
Measure voltage and current
•
•
Check compressor/fans are functioning cor-
rectly
•
•
Check fan is functioning correctly
•
•
Dirt on liquefier/vaporiser
•
•
Check refrigerant fill quantity
•
•
Check condensation drain
•
•
Test insulation
•
•
Check moving parts
•
•
Sealing test for refrigerant circuit
•
•
1)
1) see note
The statutory regulations
require an annual sealing test
for the refrigerant circuit in
relation to the refrigerant
filling level. The inspection
and documentation is to be
carried out by corresponding
specialist engineers.
NOTE
13
Содержание RVD 351DC
Страница 2: ......
Страница 31: ...Notes 31...