26
Certification for
Date 08/2002
Initial operation
Subsequent operation
of a REMKO air-conditioning system
Unit data based on type plates
The room air conditioning system above was put into operation without any objections.
The operator has been trained and the operating instructions distributed.
The unit could not be put into operation for the reasons indicated above.
Signature of person assembling,
putting unit into operation
Company:
Street:
Postal code, city:
Stamp and signature
Executing company:
Date Operator signature
Units
Connection line
Outdoor part:
Indoor unit:
Length: m
Type of unit:
RKS H – AT RKS H – IT
Height difference: m
Unit number:
378
378
Oil elevation arcs: units
Condensation pump
:
yes know
Total refrigerant amount: g
Result
Visual check:
Setup of outdoor part and indoor unit
——
R
good
Q
poor
Heat-exchanger, insulation, lines
——
R
good
Q
poor
Electrical fuse protection type.............
A
R
good
Q
poor
Electrical power/control line Cu
mm² / mm²
/
R
good
Q
poor
Impermeability check:
Vacuum
mbar
R
good
Q
poor
Excess pressure
mbar
R
good
Q
poor
Add. preparation:
Refrigerant refill amount
g
R
good
Q
poor
Shut-off valves open
——
R
good
Q
poor
Functional check:
Condensation flow, condensation pump(s) ——
R
good
Q
poor
Cooling mode
——
R
good
Q
poor
Operational check:
Compressor / fan mode
——
R
good
Q
poor
——
R
good
Q
poor
Measurement tests:
Room temperature / Air outlet temperature °C / °C
/
R
good
Q
poor
Suction temperature / Overheating
°C / K
/
R
good
Q
poor
Comments:
Test of cold cycles
Operator / Setup location
Name:
Street:
Postal code, city:
Telephone:
Fax: