6
Installation
NOTICE!
Installation should only be performed by
authorised specialists.
Unit installation
The unit is mounted on four threaded rods with the
cover face down. Take into account the ceiling grid
and any other installations.
1.
Use the dimensions of the ceiling cassette to
mark the fixing points for the threaded rods
on structural parts approved to support the
static load, and above the suspended ceiling.
2.
Fit the indoor unit onto the threaded rods and
use the lower nuts to level the unit (Fig. 27).
3.
Ensure a clearance of 35 mm from the
ceiling. Connect the refrigerant pipes, elec-
trical cables and condensation pipe to the
indoor unit as described below.
4.
Check that the unit is level.
5.
The final task is to tighten the counternuts
and attach the cover.
522
522
Fig. 26: Unit attachment (MXD 202-522)
1
1
A
B
Fig. 27: Hooking in the unit (MXD 202-522)
1: Structural component
A: Minimum 35 mm
B: 265 mm
A
Fig. 28: Fasten the unit
A: Distance A
MXD 262-522
Distance A
70 mm
Suspension
545 mm x 525 mm
23
Содержание MXD202
Страница 44: ...REMKO MXD 44...
Страница 45: ...45...
Страница 46: ...REMKO MXD 46...
Страница 47: ......