NOTICE!
The commissioning and programming of the
heat-pump manager may be carried out only
by an installer authorized by REMKO.
Please review the heat-pump manager manual
for important details about successful commis-
sioning.
During commissioning, only a typical heat-
manager pre-set is made. Individual settings
must be optimized for construction materials
and the practices of various users. Especially
during the first heating period. A review of
energy consumption and efficiency of the heat
pump is recommended at regular intervals.
9.3 Heat pump manager Multitalent
PLUS (heat flow meters)
The heat pump manager Multitalent PLUS is
equipped with the following displays relevant for
the heat flow meters:
Display level
The displays relevant to the heat flow meters are
called up with the following steps on the heat pump
manager.
Level 3
Display
End
01
Level 4
Plant
End
07
Flow volume 28 l/min
Current output 8070 W
Output day 30.2 kWh
Plant
Hot water
Heating circuit 1
Level 0
Fr 23 Apr 10 16:05
T-external 19.0 °C
T-collector 36.2 °C
Heating
Home
Level 1
Main menu
Terminal
Controller
End
01
End
01
Level 2
Controller
Display
User
Time programme
Level 4 (continued)
Plant
End
07
Output day 30.2 kWh
Output total 99 kWh
Error 00
Fig. 61: Display level
REMKO CMF/CMT
68