Caution
Replace defective or worn parts with original spare parts. Not
doing so will void warranty.
During inspection and maintenance work, always replace all
gaskets on the parts removed.
Check whether all gaskets have been positioned properly
(absolutely flat in the appropriate groove means they are gas,
air and water tight).
During the inspection and maintenance work, water (drops,
splashes) must never come into contact with the electrical parts.
Warning
Always wear safety goggles and a dust mask during cleaning work
(involving compressed air).
Danger of electric shock
Ensure that the boiler is switched off.
9.2
Maintenance message
The boiler display will clearly indicate that a service is required at the
appropriate time. Use the automatic maintenance message for preventive
maintenance, to keep faults to a minimum. The service messages show
which service kit must be used. These service kits contain all parts and
gaskets that are required for the relevant service. These service kits (A, B
or C) put together by Remeha are available from spare parts suppliers.
Important
Maintenance messages must be followed up within 2 months.
Important
If the eTwist modulating thermostat is connected to the boiler, this
thermostat can also display the maintenance message. Consult
the thermostat manual.
Caution
Reset the maintenance message following every service.
See
The service manual of the boiler.
9.3
Opening the boiler
1. Remove the two screws at the bottom of the front casing.
2. Remove the front panel.
Fig.57
Opening the boiler
AD-3001159-01
1
1
2
2
9 Maintenance
46
7701838 - v.09 - 10122021
Содержание Quinta Ace 135
Страница 74: ...13 Appendix 74 7701838 v 09 10122021...