9. Maintenance
9.1 General
Maintenance requirements
Unvented hot water systems have a continuing maintenance requirement in order to ensure safe working and optimum performance. It is
essential that the relief valve(s) are periodically inspected and manually opened to ensure no blockage has occurred in the valves or discharge
pipework.
Similarly replacement of the air in the expansion vessel will help to prevent possible operational faults.
The maintenance checks described below should be performed by a competent person on a regular basis, e.g. annually to coincide with boiler
maintenance.
After any maintenance, please complete the relevant Service Interval Record section of the Benchmark Checklist.
9.2 Standard inspection & maintenance operations
Inspection
The immersion heater boss can be used as an access for inspecting the cylinder internally.
Safety valve operation
CAUTION
Water discharged may be very hot!
#
Manually operate the temperature/pressure relief valve for a few seconds.
#
Check water is discharged and that it flows freely through the tundish and discharge pipework.
#
Check valve reseats correctly when released.
#
Repeat the above procedure for the expansion relief valve.
page 19
Descaling immersion heater(s)
#
Turn off the mains water supply, isolate the electrical supply and turn off boiler
#
Attach a hosepipe to the drain cock having sufficient length to take water to a suitable discharge point below the level of the unit.
#
Open a hot tap close to the unit and open drain cock to drain unit.
#
Open the cover(s) to the immersion heater housing(s) and disconnect wiring from immersion heater(s) thermostat(s).
Содержание 1000 Indirect
Страница 2: ......
Страница 11: ......
Страница 13: ...Figure 3 Indirect wiring diagram 1 Thermostat Option 2...
Страница 15: ...Figure 4 Single phase wiring schematic...
Страница 18: ...2 port zone valve...
Страница 19: ......
Страница 24: ......
Страница 31: ......
Страница 35: ...Figure 12 Auxiliary controls...
Страница 36: ...Figure 13 Indirect controls page 18 8 Operation 8 1 General...
Страница 45: ...3 7 8 Part No See table Part No 95 605 176 9 12 13 Part No See table Part No 95 605 182...
Страница 46: ...14 15 Part No 95 607 367 Part No 95 607 425 16 18 19 21 Part No See table Part No See table...
Страница 47: ...22 23 24 Part No 95 605 192 95 605 194 Part No 95 605 103 25 26 Part No 7033371 Part No 95 612 650...
Страница 48: ...27 28 Part No 95 612 652 Part No 95 605 884 29 30 31 Part No 7031564 7031565 Part No 95 607 690...
Страница 49: ...32 33 Part No 95 607 691 Part No 95 980 025 34 35 36 Part No 95 980 009 Part No 95 607 366 95 607 404...
Страница 51: ...page 27 page 28 page 29 MAINS PRESSURE HOT WATER STORAGE SYSTEM COMMISSIONING CHECKLIST...
Страница 52: ......
Страница 54: ......