2.1 Prior to installation
Prior to installation of solar collectors, select a suitable
position respecting the following conditions:
• roof facing South
• roof inclination (25°- 45°)
• unshaded place
• accessible for servicing
• permissible roof load
• shortest possible distance between the collectors and
(accumulation) tank
Further have ready the necessary material, tools and
safety equipment for working on a roof.
Check if the roo
fi
ng manufacturer offers roof hooks and
if the roof warranty will not be violated.
2.2 Roof anchor installation for sloping roofs
2.2.1 Installation with roof anchors and
auxiliary boards
Prior to installing anchors on auxiliary boards, the fol-
lowing shall be ensured:
• The auxiliary board length shall exceed the length of
the rail by at least 200 mm on each end.
• The auxiliary board width shall be between 100 and
200 mm.
• It shall be 30 mm thick
• The height of the auxiliary board from the counter
batten shall be equal to the batten thickness which
can be reached by underlying the auxiliary board (see
Fig. 3
).
Installation
• Remove roo
fi
ng so that auxiliary boards can be
inserted (approx. distance between boards 1600-1800
mm). For roof tiles, just shifting them upwards in the
length of the auxiliary board is suf
fi
cient (see
Fig. 4
).
40
30
10
30
30
auxiliary board
battens
counter batten
rafter
waterproofing membrane
underlay
No. of collectors Total length
No. of anchors
2 2122 mm 4
3 3184 mm 6
4 4246 mm
8
5 5308 mm 10
1062
~500
~500
~500
~500
~500
~500
~500
~500
1062
1062
1062
1062
1062
1062
1062
1062
1062
600
600
600
600
room for an auxiliary board
counter batten
rafter
roof battens
Fig. 3: Underlay to match thick battens
Fig. 4: Remove roof tiles to fi x the board
Fig. 2: Layout of roof anchors
Содержание KPC1 BP
Страница 1: ...1 Solar System with KPC1 BP Collectors EN v 1 6 Installation and Operation Manual ...
Страница 24: ...24 15 CONNECTION DIMENSIONS ...
Страница 27: ...27 ...
Страница 28: ...28 ...