Fig. 12: Inserting safety retaining brackets
• Insert nuts into both the rails (Fig. 14). Put the reta-
ining side brackets on the rails and
fi
x the collector
using M8x18 bolts.
• Lay the following collector next to the
fi
rst one, mainta-
ining a suf
fi
cient gap. Then put on the threaded
fi
ttings
(Fig. 15, pos. 9) and push the collector to the already
mounted one until stop. Hold the
fi
tting with a spanner
to prevent turning and tighten the nuts. More on this in
chapter
5 Hydraulic Connection
.
• Continue mounting further collectors in the same way
(see page 15).
Safety retaining bracket
Rails
~100 mm
B
14
~100 mm
~800 mm
6
7
5
24
39
For passing the connection pipes through a roof e.g. ventilation tiles can be used, where the hole is modi-
fi
ed according to the diameter of the pipe with insulation. Anyway standards of the roo
fi
ng manufacturer
shall be respected for pipe passage through a roof.
3. CONNECTION PIPE PASSAGE THROUGH A ROOF
5 – M8 nut for rail
6 – M8x18 allen head bolt
7 – Retaining bracket
Fig. 14: Fixing the retaining brackets
Fig. 13: Distance between the safety retaining brackets
Содержание KPC1 BP
Страница 1: ...1 Solar System with KPC1 BP Collectors EN v 1 6 Installation and Operation Manual ...
Страница 24: ...24 15 CONNECTION DIMENSIONS ...
Страница 27: ...27 ...
Страница 28: ...28 ...