background image

10

Fig. 12: Inserting safety retaining brackets

•  Insert nuts into both the rails (Fig. 14). Put the reta-

ining side brackets on the rails and 

fi

 x the collector 

using M8x18 bolts. 

•  Lay the following collector next to the 

fi

 rst one, mainta-

ining a suf

fi

 cient gap. Then put on the threaded 

fi

 ttings 

(Fig. 15, pos. 9) and push the collector to the already 
mounted one until stop. Hold the 

fi

 tting with a spanner 

to prevent turning and tighten the nuts. More on this in 
chapter 

5 Hydraulic Connection

.

•  Continue mounting further collectors in the same way 

(see page 15).

Safety retaining bracket

Rails

~100 mm

 

B      

14

~100 mm

~800 mm

6

7

5

24 

39 

For passing the connection pipes through a roof e.g. ventilation tiles can be used, where the hole is modi-

fi

 ed according to the diameter of the pipe with insulation. Anyway standards of the roo

fi

 ng manufacturer 

shall be respected for pipe passage through a roof.

   3. CONNECTION PIPE PASSAGE THROUGH A ROOF

5 – M8 nut for rail
6 – M8x18 allen head bolt
7 – Retaining bracket

Fig. 14: Fixing the retaining brackets

Fig. 13: Distance between the safety retaining brackets

Содержание KPC1 BP

Страница 1: ...1 Solar System with KPC1 BP Collectors EN v 1 6 Installation and Operation Manual ...

Страница 2: ... Connection 15 5 1 Collector connecting 15 5 2 Collector interconnecting 15 6 Temperature Probe Positioning 16 7 Pump Station 17 8 Expansion Vessel Sizing and Working Pressure Calculation 18 8 1 Expansion vessel sizing 18 8 2 Calculation of a system working pressure 18 8 3 Calculation of an expansion vessel preset pressure 18 8 4 Examples of calculating working pressure and expansion vessel pressu...

Страница 3: ...ax permissible roof load shall be checked Mounting method for solar collectors shall always respect local conditions i e roof inclination and weather influence on the overall load on the collector Kindly con sult the fixing method with a structural statics expert During installation the collectors and accessories shall be handled carefully Defects caused by improper hand ling or DIY installation a...

Страница 4: ...hors supports struts These shall be selected from the following chart by the roof type and roofing material Supports and strut for flat and sloping roof installation Code Triangle support for flat roof bracket 6859 Strut incl screws for triangle supports for flat roof 9563 Triangle bracket 25 for sloping roofs 8805 Triangle bracket 45 for sloping roofs 10094 Triangle bracket 60 for sloping roofs 9...

Страница 5: ...eces 1 08 m 2 14 m 3 205 m 4 28 m 5 35 m 6949 4 M8 nut for the rails 4 pcs 8 pcs 12 pcs 16 pcs 20 pcs 6925 5 M8 18 bolt with allen head 4 pcs 8 pcs 12 pcs 16 pcs 20 pcs 7259 6 Retaining side bracket 4 pcs 8 pcs 12 pcs 16 pcs 20 pcs 7725 7 Retaining bracket for collector bottom 2 pcs 4 pcs 6 pcs 8 pcs 10 pcs 7709 8 Compression nut and ring for collec tor interconnectio 2 pcs 4 pcs 6 pcs 8 pcs 7629 ...

Страница 6: ... at least 200 mm on each end The auxiliary board width shall be between 100 and 200 mm It shall be 30 mm thick The height of the auxiliary board from the counter batten shall be equal to the batten thickness which can be reached by underlying the auxiliary board see Fig 3 Installation Remove roofing so that auxiliary boards can be inserted approx distance between boards 1600 1800 mm For roof tiles...

Страница 7: ... places shall be selected for mounting where anchors can be fixed sufficiently into the roof frame rafter or similar Prior to fixing the anchor apply suitable silicone putty on the contact surface adjacent to the roofing in order to prevent water leaking or possibly use a sealing method recommended by the roofing manu facturer Simply lay the anchor onto the roof tiles and fix it with stainless ste...

Страница 8: ...50 7 5 RIGHT 10 30 mm Fig 8 Right anchor position with roof tiles c Roof anchor of stainless steel or zinc plated steel for pantiles a Stainless steel anchor on rafter for pantiles incl screws b Aluminum anchor on rafter for pantiles d Aluminum roof anchor for panti les adjustable height e Aluminum roof anchor for metal or slate roofing 100 ø 9 80 100 4 0 40 f Roofing bolt for rail fixing ...

Страница 9: ...f the retaining brackets The collector bottom edge is by circa 75 mm lower The distance between the collector edge and the end of the bottom rail is B 35 mm Fig 13 rozmĈr kolektoru 1000 2 000 mm rozmĈr kolektoru 1000 2 000 mm rozmĈr kolektoru 1000 2 000 mm rozmĈr kolektoru 1000 2 000 mm rozmĈr kolektoru 1000 2 000 mm rozmĈr kolektoru 1000 2 000 mm rozmĈr kolektoru 1000 2 000 mm rozmĈr kolektoru 10...

Страница 10: ...ore on this in chapter 5 Hydraulic Connection Continue mounting further collectors in the same way see page 15 Safety retaining bracket Rails 100 mm B 14 100 mm 800 mm 6 7 5 24 39 For passing the connection pipes through a roof e g ventilation tiles can be used where the hole is modi fied according to the diameter of the pipe with insulation Anyway standards of the roofing manufacturer shall be re...

Страница 11: ...05 m 4 28 m 5 35 m 6949 5 M8 nut for the base rail 4 pcs 8 pcs 12 pcs 16 pcs 20 pcs 6925 6 M8x18 bolt allen head 4 pcs 8 pcs 12 pcs 16 pcs 20 pcs 7259 7 Retaining side bracket 4 pcs 8 pcs 12 pcs 16 pcs 20 pcs 7725 8 Retaining bracket for collector bottom 2 pcs 4 pcs 6 pcs 8 pcs 10 pcs 7709 9 Compression nut and ring for collector interconnection 2 pcs 4 pcs 6 pcs 8 pcs 7629 10 Insulation 35 mm dia...

Страница 12: ...oves cca 500 mm D2 2 4 4 1660 mm T strut base rails L strut D1 Fig 16 Aligning the rails and mounting the first triangular support Assemble the triangular supports that come partially screwed together Fig 17 Fix the loose support ends with a bolt Fig 17 and tighten all connections Locate the positions to fix triangular supports The distance of the first triangular support from the end of the rail ...

Страница 13: ...angular supports is similar to that of roof anchors in Fig 2 and the last support shall be located about 500 mm from the ends of both rails After fixing the strut and other supports kip the entire structure into the position intended for collector installation The strut is upright T rail of each triangular support lies on the ground spanner No 13 3 2 c Fig 19 Strut installation Fig 20 Installation...

Страница 14: ...alist Fix the collectors to the rails in the same man ner as if installing on an inclined roof see point 2 4 Minimum distance between collector fields see Fig 22 Flat roof mount up to 8m high roof 1 collector 290 kg 2 collectors 580 kg 3 collectors 870 kg 4 collectors 1160 kg 5 collectors 1450 kg Fig 21 Static safety burden twice the height winter sun solar collector height 2 5 solar collector Fig...

Страница 15: ...gh collector arrays are shown in Tab 1 Collectors may be also connected as shown in Fig 23b This kind of connection is permitted when up to 3 collectors are used and the max flow rate is 1 l min collector Then the cold liquid inlet is at one side bottom and the hot liquid outlet is at the same side top Both the other ends shall be plugged A brass elbow shall be installed at the inlet to the collec...

Страница 16: ...use earthing Pipes of the solar system must be fitted with thermal insulation e g of AEROFLEX type so that thermal dissipation from the pipes does not deteri orate a total efficiency of the solar system The thermal insulation must be resistant to temperatures up to 160 C for outdoor piping also a UV protection is essential as well as non deliquescence of the material For indoor piping the thermal ...

Страница 17: ...6 bar safety valve manometer and G connection to expansion tank 7 SOLAR PUMP STATION 4 Air eliminator 5 3 speed circulation pump manual control 6 Flow control screw 7 Filling valve 8 Flowmeter 9 Drain valve 10 Safety valve spillway connection Safety valves are always included in pump stations If no pump station is used in the installation the solar system shall be equipped with a 6 bar safety valv...

Страница 18: ...essure in a solar system bar h height from a pressure gauge to the middle of a col lector field m Adjust the pressure by discharging solar liquid after the pressure test is done 8 3 Calculation of expansion vessel preset pressure Before filling the system adjust the initial overpressure in the expansion vessel to a value by 0 5 bar below the calculated system pressure p exp p 0 5 bar In order to s...

Страница 19: ...s from the fluid see Fig 30 A ball valve shall be always installed under the automatic air vent valve so that the automatic air vent can be clo sed after the system commissioning Solar liquid leaks can be avoided in case of system stagnation For an efficient removal of bubbles from the system it is advisable to fit the pump station with an air eliminator see Fig 29 9 INSTALLATION OF AIR RELEASE VA...

Страница 20: ...culation pump s to the highest speed and repeat switching on and off to air bleed the system an air free pump works almost noiselessly watch the system pressure and when it starts falling increase it by turning on the filling pump and opening the feed valve to 5 bar repeat air bleeding so long until the float in the flowmeter s regulation valve takes a steady position during pump operation and bub...

Страница 21: ... checked Once a year preferably during a sunny day it is necessary to check the working order and tight fixing of the collectors verify the system tightness and pressure incl pressure in the expansion vessel and the pump operation At least once in every 2 years the heat carrying fluid shall be checked for its antifrost properties The system shall be always replenished with the same fluid as the or...

Страница 22: ...es dimension 4 Ø 22 mm 0 8 mm absorber tube material copper absorber tube dimension 8 Ø 10 mm 0 6 mm solar absorptance 94 emmisivity 8 max working pressure 6 bar max working temperature 120 C stagnation temperature 138 9 C heat carrier solution of monopropylene glycol in water 1 1 2l recommended flow rate 60 120 l h Thermal Insulation material mineral wool insulation thickness 40 mm Frame material...

Страница 23: ...kolektoru v nulovém bodČ pĜi G 1000 W m2 je 1455 W WODNRYi WUiWD NROHNWRUX 3D SUĥWRN O K WODN WUiWD 3D Momentary efficiency per aperture area Collector power output in zero point for G 1000 W m2 is 1455 W Collector pressure drop Pa Flow rate l h Pressure drop Pa Effi ciency ...

Страница 24: ...24 15 CONNECTION DIMENSIONS ...

Страница 25: ... Check pipe insulation Check the proper flow rate Check temperature probes Check the quality of antifreeze liquid with a refractometer Check the heat carrier pressure replenish if necessary Check the controller settings Check for possible error messages in the controller and their reason Check wiring Check backup heating function el heating rod gas fired boiler Check the magnesium anode rod in the...

Страница 26: ...t the service action This Service Action has been carried out by an authorized servicing company Date of Service Action Name of the servicing company Address of the servicing company Name of the servicing person Contact phone Description of the intervention Signature of the person who has carried out the service action This Service Action has been carried out by an authorized servicing company Dat...

Страница 27: ...27 ...

Страница 28: ...28 ...

Страница 29: ...29 11 2010 REGULUS spol s r o Do Koutů 1897 3 143 00 Praha 4 http www regulus eu E mail sales regulus cz Your service ...

Отзывы: