background image

33

FPI P36-4 Zero Clearance Direct Vent Gas Fireplace

INSTALLATION

4)

  Separate the 2 halves of the wall thimble and 

securely fasten the one with the tabs to the 
outside wall making sure that the tabs are 
on top and bottom. Fasten the other thimble 
half to the inside wall. The thimble halves 
slip inside each other and can be adjusted 
for 2 x 4 or 2 x 6 walls. 

The liners must slip 

over the collars a minimum of 1-3/8".

5)

  Slip the assembled liner and termination 

assembly through the thimble making sure 
the termination cap faces up (there are 
markings on the cap that show which way 
is up). This will position the termination cap 
with proper down slope for draining water. 
Fasten the cap to the outer wall with the 4 
supplied screws. 

6)

  Pull the centre 4"(100mm) liner and outer 

6-7/8"(175mm) liner out enough to slip over 
the fl ue collars of the fi replace.  (You may 
wish to cut the liner shorter to make it more 
workable.) Do not bend liner more than 
90

o

.

7)

  Apply Mill Pac over the fi replace inner collar 

and slip the 4"(100mm) liner down over it 
and attach with 3 supplied screws.

8)

  Do the same with the 6-7/8"(175mm) liner.

9)

  Apply a bead of silicone between the thimble 

and termination and around the outer edge 
of the terminal at the wall in order to keep 
the water out.

IMPORTANT: Do not locate termination 
hood where excessive snow or ice 
buildup may occur. Be sure to check vent 
termination area after snow falls, and clear 
to prevent accidental blockage of venting 
system. When using snow blowers, make 
sure snow is not directed towards vent 
termination area.

N o t e :   To   m a k e 
t h e   i n s t a l l a t i o n 
more aesthetically 
p l e a s i n g ,   w e 
recommend framing 
out a square to 
mount the terminal 
to.

Offset Chart

DIRECT VENT 

SYSTEM (FLEX) 

INSTALLATION 

PROCEDURES

1)

  Locate the unit in the framing, rough in the 

gas (preferably on the right side of the unit) 
and the electrical (Junction block is on the 
left side) on the left. Locate the centerline of 
the termination and mark wall accordingly. 
Cut a 10"(254mm) hole in the wall (inside 
dimension).

Note:  A 2" clearance at the top and 1 1/2" 

clearance around the liner must be 
maintained except that only a 1" 
(25mm) clearance is needed at the 
termination end. We recommend 
framing a 10"(254mm) x 10"(254mm) 
(inside dimensions) hole to give 
structural rigidity for mounting the 
termination.

Note:  If installing termination on a siding 

covered wall,  furring strips must be 
used to ensure that the termination 
is not recessed into the siding.

2)

 Level the fi replace and fasten it to the 

framing using nails or screws through the 
nailing strips.

3)

  Assemble the vent assembly by applying 

Mill Pac to the 4"(100mm) inner collar of 
the termination and  slipping the 4"(100mm) 
liner over it at least 1-3/8" (35mm). Fasten 
with the 3 screws (drilling pilot holes will 
make this easier). Apply Mill Pac or high 
temperature silicone to the 6-7/8"(175mm) 
fl ex pipe and slip it over the 6-7/8" outer 
collar of the vent terminal at least 1-
3/8"(35mm) and fasten with the 3 screws.

NOTE:  

 

  Horizontal sections must be 

supported at intervals not exceeding 
3 feet (0.9 meter). (Flame picture and 
performance will be affected by sags 
in the liner).

can result from high wind conditions near big 
trees or adjoining roof lines, in these cases, 
increasing the vent height may solve the 
problem.

7)

  Ensure vent is vertical and secure the base 

of the fl ashing to the roof with roofi ng rails, 
slide storm collar over the pipe section and 
seal with a mastic.

8)

  Install the vertical termination cap by twist-

locking it.

Note: Any 

closets or storage spaces, which 

the vent passes through must be 
enclosed. 

Содержание P36-NG4

Страница 1: ...owed exactly a fire or explosion may result causing property damage personal injury or loss of life FOR YOUR SAFETY Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance Installation and service must be performed by a qualified installer service agency or the gas supplier FOR YOUR SAFETY What to do if you smell gas Do not try to light any...

Страница 2: ...o provide you with all the warmth and charm of a wood fireplace at the flick of a switch The model P36 has been approved by Warnock Hersey for both safety and efficiency As it also bears our own mark it promises to provide you with economy comfort and security for many trouble free years to follow Please take a moment now to acquaint yourself with these instructions and the many features of your F...

Страница 3: ...h the manufacturer s installation instructions and local codes if any In the absence of local codes follow the current National Fuel Gas Code ANSI Z223 1 and the current National Electrical Code ANSI NFPA 70 in the U S A and the current CAN CGA B149 Gas Installation Code and the current Canadian Electrical Code CSA C22 1 in Canada ThisFPIMobile ManufacturedHomeListedappliancecomes factory equipped...

Страница 4: ...justment 35 Gas Pipe Pressure Testing 35 Conversion Kit 514 969 from NG to LP 36 Optional Brick Panels 39 Log Set Installation 40 Standard Flush Door 43 Remote Control Optional 44 Wall Switch Optional 44 Wall Thermostat Optional 44 Wiring Diagrams 45 Alternate Wiring Diagram For Wall Switch 46 SAFETY LABEL Safety Label 6 REQUIREMENTS MA Code CO Detector 7 DIMENSIONS Unit Dimensions 8 Hampton Facep...

Страница 5: ...plated Brass Louvers or Trim 51 Log Replacement 51 Thermopile Thermocouple 51 Glass Gasket 51 Door Glass 51 Bay Glass Replacement 51 Flush Glass Replacement 51 Removing Valve 52 Installing Valve 52 REGENCY OPTIONS Flush Trim 53 Flush Louvers 53 Bay Door 54 Bay Trim 54 Bay Louvers 54 Finishing Trim 55 HAMPTON OPTIONS Hampton Cast Faceplate 56 Hampton Cast Grills 57 PARTS LIST Main Assembly 58 Burne...

Страница 6: ... 000 Btu h 8 79 kW This appliance must be installed in accordance with local codes if any if none follow the National Fuel Gas Code ANSI Z223 1 or Natural Gas and Propane Installation Code CSA B149 1 This appliance must be installed in accordance with the Standard CAN CSA Z240 MH Mobile Housing in Canada or with the Manufactured Home Construction and Safety Standard Title 24 CFR Part 3280 in the U...

Страница 7: ...e directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS 4 INSPECTION The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless upon i...

Страница 8: ...e Direct Vent Gas Fireplace DIMENSIONS UNIT DIMENSIONS 32 1 2 826mm 36 940mm 30 1 2 775mm 12 3 4 324mm 36 914mm 33 1 4 838mm 36 914mm 43 1 4 1099mm 32 1 4 819mm 29 1 2 749mm 31 1 4 794mm 1 1 4 32mm HAMPTON FACEPLATE DIMENSIONS ...

Страница 9: ...fied service per son A professional service person should be called to inspect this appliance annually Make it a practice to have all of your gas appliances checked annually 13 Do not slam shut or strike the glass door 14 Undernocircumstancesshouldanysolidfuels wood paper cardboard coal etc be used in this appliance 15 The appliance area must be kept clear and free of combustible materials gases a...

Страница 10: ...ding the full width and depth of the appliance 4 The P36 Direct Vent Gas Fireplace can be installed in a recessed position or framed out into the room as in A B C D See Diagram 1 Note For vent terminations see the Exterior Vent Termination Locations section MANUFACTURED MOBILE HOME ADDITIONAL REQUIREMENTS 1 Ensure that structural members are not cut or weakened during installation 2 Ensure proper ...

Страница 11: ...urface of the carpeting tile etc Minimum Clearance from Top of Unit to Ceiling from top of unit 32 1016mm Bay or Flush Front 6 152mm Hampton Cast Faceplate 6 152mm Full Screen Doors 6 152mm Measured from Surround or Front See the Regency Clearances for dimensions section Horizontal Vent Clearances Top 2 51mm Side 1 1 2 38mm Bottom 1 1 2 38mm Vertical Vent Clearances 1 1 4 32mm Alcove Clearances Ma...

Страница 12: ...12 FPI P36 4 Zero Clearance Direct Vent Gas Fireplace INSTALLATION Clearances for Bay Front Flush Front Full Screen Doors REGENCY CLEARANCES HAMPTON CLEARANCES TRIPOLI ARCH DOOR CLEARANCES ...

Страница 13: ...RIES COMBUSTIBLE MANTEL CLEARANCES These drawings are to scale at 1 6 one inch 6 inches Mantel can be installed anywhere in shaded area or higher using the above scale Note Ensure the paint that is used on the mantel and the facing is heat resistant or the paint may discolour Note A non combustible mantel may be installed at a lower height if the framing is made of metal studs covered with a non c...

Страница 14: ... diagram below Note A non combustible mantel may be installed at a lower height if the framing is made of metal studs covered with a non combustible board REGENCY SERIES COMBUSTIBLE MANTEL CLEARANCES Because of the extreme heat this fireplace emits the mantel clearances are critical Combustible mantel clearances from top of unit are shown in the diagram below Note A non combustible mantel may be i...

Страница 15: ...L LEG CLEARANCES Combustible mantel leg clearances as per diagram HAMPTON FRONT MANTEL LEG CLEARANCES Combustible mantel leg clearances as per diagram Maximum 1 1 2 projection at 2 minimum clearance Maximum 1 1 2 projection at 2 minimum clearance Hampton Cast Faceplate Width 43 1 4 ...

Страница 16: ...Arch Door a non combustible material 12 305mm above the unit and 6 153mm on each side must be used See diagram 2 For complete framing dimensions see page 57 in this manual The Tripoli Arch Door also requires steel stud framing above and on each side of the unit see diagram 2 TRIPOLI ARCH DOOR FRAMING NOTE ...

Страница 17: ... 4 36 1 4 12 3 4 46 921mm 921mm 324mm 1168mm D is Minimum height to combustible mate rials including the Minimum 2 51mm Top clearance to the Horizontal Vent 12 3 4 3 1 2 4 2 40 1 2 36 32 1 2 10 dia hole through wall for Flex or for DuraVent 1 2 Drywall Top Header Opening for gas connection Note 40 1 2 1029mm is the minimum height for both flex termination or rigid pipe venting NOTE See next page f...

Страница 18: ... combustion chamber thereby eliminating the need to use heated room air for combustion and losing warm room air up the chimney Note These flue pipes must not be connected to any other appliance The gas appliance and vent system must be vented directly to the outside of the building and never be attached to a chimney serving a separate solid fuel or gas burning appliance Eachdirectventgasappliancem...

Страница 19: ... extended above meter regulator assembly 36 90cm a J Clearance to service regulator vent outlet 36 90cm K Clearance to non mechanical air supply inlet to building or the combustion air inlet to any other appliance 12 30cm 9 23cm L Clearance to a mechanical air supply inlet 3 91cm above if within 10 3m horizontally 72 1 8m 36 90cm b M Clearance above paved sidewalk or a paved driveway located on pu...

Страница 20: ...termination cap 1 6 screws 12 7 tube of Mill Pac 1 8 plated screws 8 9 screws 8 x 1 1 2 Drill Point Stainless Steel 4 1 6 7 8 dia flexible liner 10 ft length 2 4 dia flexible liner 10 ft length 3 spring spacers 7 4 thimble 2 5 AstroCap termination cap 1 6 screws 12 7 tube of Mill Pac 1 8 plated screws 8 9 screws 8 x 1 1 2 Drill Point Stainless Steel 4 If longer runs are needed the FPI Direct Vent ...

Страница 21: ...A N A Adjustable Length 3 10 Galvanized N A N A N A 4DAL N A TC 4DLT Adjustable Length 3 10 Black N A N A N A 4DALB N A TC 4DLTB Adjustable Length 7 Galvanized N A N A 4D7A N A N A N A Adjustable Length 7 Black N A N A 4D7AB N A N A N A Extension Pipe 8 1 2 Galvanized 46DVA 08A N A N A N A N A N A Extension Pipe 8 1 2 Black 46DVA 08AB N A N A N A N A N A Adjustable Length 12 Galvanized N A N A 4D1...

Страница 22: ...on 36 46DVA HC N A N A N A N A TM 4ST36 Basic Horizontal Termination Kit A Disc 4DT HKA 4DHTK2 4DHTKA SV SHK N A Horizontal Termination Kit B 46DVA KHA Changed Components 4DT HKB 4DHTK1 4DHTKB SV HK N A Vertical Termination Kit Disc 4DT VKC 4DHTK 4DHTK SV FK N A FPI 946 506 P Vent Guard Optional for AstroCap 946 205 Vinyl Siding Shield for Riser Vent Terminal 510 994 Rigid Pipe Adaptor Must use wi...

Страница 23: ...t Wall Installation Wall Thickness inches Vent Length Required inches 4 5 1 2 6 7 8 1 2 9 10 1 1 2 12 9 14 1 2 11 14 5 8 Adj Pipe 15 23 1 2 17 24 Adj Corner Installation Wall Thickness inches Vent Length Required inches 3 1 4 6 3 4 11 14 5 8 Adj Pipe 7 3 4 16 1 4 17 24 Adj Pipe 7 1 4 8 3 4 6 12 9 9 4 1 4 5 3 4 6 9 This product has been evaluated by Intertek for using a Rigid Pipe Adaptor in conjun...

Страница 24: ... diameter 6 7 8 inner diameter Maintain clearances to combustibles Horizontal vent must be supported every 3 feet Firestops are required at each floor level and whenever passing through a wall NOTE If you are installing the P36 into a FPI Cabinet Mantel Kit use the minimum horizontal vent height centre line of 40 1 2 Remember to include the mantel base 3 in height in your calculations and to maint...

Страница 25: ... elbows is required A 0 Min 2 Max B 1 Min 3 Max C 2 Min 4 Max D 3 Min 5 Max E 4 Min 6 Max F 5 Min 7 Max G 6 Min 8 Max Lengths do not include elbow indicated Option V H V V1 H H1 With these options max total pipe length is 30 feet with min of 12 feet total vertical and max 9 feet total horizontal Please note min 1 foot between 90o elbows is required A 0 Min 1 Max 1 Min 2 Max B 1 Min 2 Max 3 Min 3 M...

Страница 26: ...Min 2 Max 1 Min B 1 Min 4 Max 2 Min C 2 Min 5 Max 3 Min D 3 Min 6 Max 4 Min E 4 Min 7 Max 5 Min F 5 Min 8 Max 6 Min Lengths do not include elbow indicated For additional vertical venting with 2 x 90o elbows refer to next page Option V H H1 V V1 With these options max totalpipelength is 30 feet with min of 10 feet total vertical and max 8 feet total horizontal Please note min 1 foot between 90o elb...

Страница 27: ...clearances to combustibles Note Must use optional rigid pipe adaptor when using rigid vent systems Part 510 994 RIGID PIPE VENTING ARRANGEMENTS VERTICAL TERMINATIONS Propane Natural Gas The shaded area in the diagram shows all allowable combinations of straight vertical and offset to vertical terminations using two 90o elbow with Rigid Pipe vent systems for Propane and Natural Gas ...

Страница 28: ...as as per the diagram 1 The shaded area in the diagram 1 shows all allowable combinations of straight vertical and offset to vertical terminations with rigid pipe vent systems for Propane and Natural Gas Maximum two 45o elbows allowed Vent must be supported at offsets Firestops are required at each floor level and whenever passing through a wall Maintain clearances to combustibles ...

Страница 29: ...y chimneys may take various contours which the flexible liner will accommodate However keep the flexible liner as straight as possible avoid unnecessary bending The Air Intake pipe must be attached to the inlet air collar of the termination cap Required Parts Part Description 946 529 Co linear DV Vertical Termination Cap 948 305 3 Flex 35 ft 946 563 Co Axial to Co Linear Adapter Kit which contains...

Страница 30: ...aded area in the diagrams show the allowable vertical terminations 8 Min 40 1 2 30 Max 30 Horizontal Distance Feet Vertical Height feet 2 max VENTING ARRANGEMENTS VERTICAL TERMINATION with Co linear Flex System for both Residential Manufactured Homes into Masonry Fireplaces ...

Страница 31: ...procedure Four indenta tions located on the female ends of pipes and fittings are designed to slide straight onto the male ends of adjacent pipes and fittings by orienting the four pipe indentations so they match and slideintothefourentryslotsonthemale ends Diagram1 Pushthepipesections completely together then twist lock one section clockwise approximately one quarter turn until the two sections a...

Страница 32: ...en the vent pipe and the vent cap by attaching the two sheet metal strips extending from the vent cap assembly into the outer wall of the vent pipe Use the two sheet metal screws provided to connect the strips to the pipe section See Diagram 6 9 Install wall thimble in the center of the 10 square and attach with wood screws Diagram 7 DURA VENT VERTICAL floor or ceiling of every level To install th...

Страница 33: ...to Offset Chart DIRECT VENT SYSTEM FLEX INSTALLATION PROCEDURES 1 Locate the unit in the framing rough in the gas preferably on the right side of the unit and the electrical Junction block is on the left side on the left Locate the centerline of the termination and mark wall accordingly Cut a 10 254mm hole in the wall inside dimension Note A 2 clearance at the top and 1 1 2 clearance around the li...

Страница 34: ...Btu h Minimum Output with blower Off 11 500 Btu h Supply Pressure min 5 0 w c Manifold Pressure High 3 8 0 2 w c Electrical 120 V A C System Circulation Fan variable speed 130 CFM Log Set Ceramic fibre 7 per set Vent System Simpson Dura Vent Direct Vent System or FPI Direct Vent System Flex Note Output capacity The efficiency rating of the appliance is a product thermal efficiency rating determine...

Страница 35: ... closing its individual manual shut off valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1 2 psig 3 45 kPa Disconnect piping from valve at pressures over 1 2 psig Themanifoldpressureiscontrolledbyaregulator built into the gas control and should be checked at the pressure test point Note To properly check gas pressure both inlet and manifold ...

Страница 36: ... 910 037 LPG Injector Pilot Orifice 1 918 481 Instruction Sheet 5 Remove the 2 screws holding the Burner Assembly to the firebox base Push the Burner Assembly to the left and lift out DC Sparker Kit Contains Qty Part Description 1 820 475 Bracket DC Sparker 1 820 476 Bracket DC Sparker 1 904 153 Washer 8 External Star 1 904 330 Nut 8 32 Hex 2 904 531 Bushing Split Plastic 0 500 in 1 904 543 Screw ...

Страница 37: ...r and connect it to the DC Sparker Piezo Ignitor Ignitor Wire Piezo Ignitor Ignitor Wire DC Sparker 18 Reverse steps 6 1 Fig 1 11 Remove the black protection cap by hand from the hi low knob Fig 1 Fig 2 14 Flip the screw Fig 3 Fig 4 Fig 3 15 Using the Allen wrench as shown in Fig 4 rotate the screw clockwise until snug do not overtighten 12 Insert a 5 32 or 4mm Allen wrench into the hexagonal key ...

Страница 38: ... and outlet pressures 37 Check operation of flame control 38 Check for proper flame appearance and glow on logs NOTE The battery in the DC Sparker Box will need to be replaced an nually 25 Locate the ground lug 26 Connect one end of the supplied green ground wire to the lug with the nut and washer from the kit Ground wire from kit 28 Install the 1 2 bushing to the heat shield 32 Mount the heat shi...

Страница 39: ... in the unit 2 Insert the back brick panel first by carefully slipping it between the back wall of the firebox and the rear log bracket 3 Put the side panels in next Slide them in from the front and push them flat up against the wall Be very careful not to scratch them on the firebox hardware 4 Install the 2 brick retaining clips one on each side OPTIONAL BRICK PANELS ...

Страница 40: ...rmiculite j 946 669 Platinum Embers supplied w packaged manual 4 Place Log 02 51 on the front right side of the burner Push the back of the log against the 2 brackets with the notch on the bottom right side of the log fitting into the right side of the grate Notch Bracket Bracket 3 Place Log 02 49 on the rear log support pins with the flat side to the back 02 49 02 51 NOTE If installing the option...

Страница 41: ...2 front brackets with the notch on the bottom of the log fitting into the first grate tab Notch 02 55 02 50 02 54 5 Position Log 02 53 across the cutouts in Logs 02 49 and 02 51 with the notch on the left side of the log fitting into the 2nd grate tab Cutouts 2nd Grate Tab 02 53 02 49 02 51 02 49 02 51 02 53 02 49 02 51 02 53 02 55 02 53 02 50 02 55 02 53 02 50 02 55 02 53 02 49 02 51 02 53 02 51 ...

Страница 42: ...9 and on the indentation on Log 02 54 The bottom right end sits behind the rear grate tab 10 Place the embers on the front of the burner tray in the places shown on the photo Separateplatinumembersandplaceonthefrontburneron and around the embers Avoid stacking platinum embers Platinum embers may be placed over burner ports 11 Test fire to ensure proper light off make sure flame flows smoothly from...

Страница 43: ...2 The standard flush door comes with a black frame To install the frame simply hook the top door flange onto the top of the unit and swing the door towards the unit see Diagram 1 Be careful that the glass gasket does not roll up there must be a gap between the gasket and the door lip to ensure that the door sits securely on the unit see Diagram 2 Diagram 1 STANDARD FLUSH DOOR To remove the flush d...

Страница 44: ... SWITCH OPTIONAL 1 Run the wire through the right or left side inlet opening Be careful not to damage wire Note We recommend a maximum of 15 of wire but if you wish to go with a longer run use the Thermostat Wire Table 2 Connectthewiretothewallswitchandinstall into the receptacle box See the Alternate Wiring Diagram for Wall Switch section for wiring diagrams CAUTION Do not connect millivolt wall ...

Страница 45: ...optional remote control thermostat will continue to operate However a 120V A C power supply is needed for the fan blower operation Do not cut the ground terminal off under any circumstances NOTE Even if the fan is not purchased with the unit it is still a good idea to bring power to the receptacle box provided with the unit in case the fan is installed at a later date Caution Ensure that the wires...

Страница 46: ... 120 Vol t s 60 Hz CopperG r ound W hi t e Neut r al Bl ack Hot P36 El ect r i calConnect i on Al t er nat i ve Schem e B Pow eratSw i t ch W al lJunct i on Box Speed Cont r ol Swi t ch wi t h l ead wi r es W i r e Nut s 14AW G wi r e W i r e Cl am p 120 Vol t s 60 Hz CopperG r ound W hi t e Neut r al Bl ack Hot W i r e Bl ack W hi t e G r ound Recept acl e Box i nsi de st ove Recept acl e dedi ca...

Страница 47: ...P36 4 Zero Clearance Direct Vent Gas Fireplace INSTALLATION For PROPANE Units and Units Equipped with DC Spark Boxes For installation of the DC Spark Box refer to the LP Conversion instructions in this manual ...

Страница 48: ...gainst the valve tub ing Diagram 1 8 Secure the two boxes together with one screw 10 Remove the control box assembly and push the hold downclipontothelouver Bend the tab until it is at 90o to the louver 12 Secure the fan wires and power cord by attaching one of the adhesive backed wire holder clips Part 910 199 onto the stove base Use the second clip to bundle up the wiresapproximately4 fromthecon...

Страница 49: ...hicknesses of steel will expand and contract at different rates resulting in some cracking and ticking sounds will be heard throughout the cycling process IMPORTANT Gas on off knob cannot be turned from PILOT to OFF unless it is partially depressed 1 Turn burner OFF using ON OFF switch 2 Turn gas control knob so indicator points to OFF position and allow 5 minutes for any gas in the combustion cha...

Страница 50: ...lames are steady not lifting or floating If there is a problem call a qualified service person 5 The appliance and venting system must be inspected before use and at least annually by a qualified field service person to ensure that the flow of combustion and ventilation air is not obstructed Note Never operate the appliance without the glass properly secured in place 6 Donotusethisapplianceifanypa...

Страница 51: ...3 Disconnect thermocouple by loosening nut from the valve with a 9mm wrench Dis connect thermopile by loosening 2 screws marked TP on the valve 4 Drop the thermocouple or thermopile down from the bracket and pull it out of the unit 5 Reinstall the new ones in reverse order GLASS GASKET If the glass gasket requires replacement use 5 8 flat glass gasket for the Bay Front Part 936 243 and a tadpole g...

Страница 52: ...mm wrench 6 Reconnect the pilot tube nut with a 7 16 wrench 7 Scrapeofftheoldgasketfromthefloorofthe firebox and from the valve tray assembly 8 Install a new gasket and reinstall the valve tray assembly Note Failure to install a new gasket may severely affect the appliance per formance 9 Reinstall the 10 hold down screws 10 Hook up the 2 TP and 2 TH wires to the appropriate connections on the valv...

Страница 53: ...into the brackets located underneath the top of the firebox 2 The bottom louver has a hinge that is attached 2 screws per hinge to the lip on bottom of the unit 3 Open the bottom louver Pull the Burner ON OFF control box from inside the bottom of the fireplace and position the slots in the bracket over the 2 screws on the left side of the bottom louver Push down to lock into place Tighten the scre...

Страница 54: ...nto the valve knobs Note If any maintenance etc must be done in the firebox first remove the Bay louvers and door BAY TRIM Attach 4 supplied magnets each to the back of the top and bottom trim pieces and attach trim to the top and bottom of Bay door 3 Slide the valve extension knobs onto the valve knobs Match the correct ext knob with the valve knob 4 Open the bottom louver Pull the Burner ON OFF ...

Страница 55: ...trim with the holes in the firebox side 2 Secure with 2 screws per side 3 Loosen the 3 screws in the top inside edge of the firebox 4 Slide the Finishing Trim Top over the Side Trim pieces and fit the bottom bracket slots over the screws Tighten the 3 screws to secure 5 Loosen the 2 screws on the hinge bracket on both the left and right side of the louver 6 Hook the bottom finishing trim to the si...

Страница 56: ...of faceplate with screw 4 Repeat step 3 for the right side faceplate Secure bottom of faceplate with screw 5 Slide top piece of faceplate into side faceplates by fitting mounting plates into brackets 6 Push in both side faceplate pieces and completely tighten screws 7 Re install top louver 8 Close bottom louver Side piece Faceplate Back View Bracket on back of side faceplate Top piece Faceplate NO...

Страница 57: ...he same 2 screws removed in step 3 5 Install hinge to bracket then secure with screw New hinge bracket Left side shown 6 Place something underneath bottom grill to prevent scratching 7 Line up hinge holes in bottom grill holes 8 Place screws half way in do not secure completely Hinge 9 Place bracket over screws then push to the side against faceplate to lock in place as per diagram 10 Tighten scre...

Страница 58: ...rick Panel Back 34 Brick Panel Left 35 Brick Panel Right 511 031 Brick Clips each 432 967 Burner On Off Switch Assy 38 910 241 Switch Burner On Off 910 899 Wire Harness Valve to Burner 432 917 F a n A s s e m b l y 1 2 0 V Optional 42 910 331 P Fan Motor 120 V 432 966 Fan Switch Assembly 120 Volts Optional 43 910 813 Power Cord 120 Volts 46 910 330 Fan Speed Control Switch 47 904 586 Knob Speed Co...

Страница 59: ...ob 56 910 190 Piezo Ignitor 57 910 478 SIT Valve NG LPG 58 Valve Bracket 59 Firebox Base 66 910 038 Pilot Assy S I T 3 Flame NG 910 039 Pilot Assy S I T 3 Flame LP 67 Pilot Holder 68 W840470 Pilot Assembly Gasket 904 240 Orifice 37 Natural Gas 904 390 Orifice 52 Propane 936 170 Orifice Gasket 910 036 Pilot Orifice NG 910 037 Pilot Orifice LP 79 512 535 Burner Assy 82 511 030 Burner Grate Assy 83 4...

Страница 60: ... Louvers Steel Black 133 Flush Louver Assy Top 134 Flush Louver Assy Bottom 135 940 090 P Glass Flush 136 936 155 Glass Gasket Tadpole 904 691 U Clip 146 Barcelona Assy Black 148 Barcelona Louver Assy Black 150 Flush Glass Trim Gold 904 196 Magnet 1 round 510 947 Flush Glass Trim Steel Set 152 Flush Glass Trim 904 196 Magnet 510 986 Finishing Trim Black 157 Finishing Trim Left 158 Finishing Trim T...

Страница 61: ...08 940 094 P Center Glass 112 Bay Front Trim Top Bottom 780 934 Bay Door Trim Gold 113 Bay Door Trim Gold Bottom 114 Bay Door Trim Gold Top 510 988 Bay Louvers Black 510 990 Bay Louvers Gold Black 510 993 Bay Louvers Steel Black 115 Bay Louver Assy Top 116 Bay Louver Assy Bottom 117 904 196 Magnet 1 round 120 Flush Glass Retainer Bracket 122 948 216 Regency Logo Plate Not available as a replacemen...

Страница 62: ...201 Cast Faceplate Right 202 Cast Faceplate Top 203 Cast Faceplate Left 513 981 Cast Grills Set 204 Top Grill 205 Bottom Grill Not available as a replacement part Last digit of part number represents colour 1 Black Metallic 5 Enamel Brown HAMPTON CAST FACEPLATE GRILL ASSEMBLY Part Description ...

Страница 63: ...agent Transportation Prepaid if requested Porcelain Enamel Absolute perfection is either guaranteed nor commercially possible Any chips must be reported and inspected by an authorized dealer within three days of installation Reported damage after this time will be subject to rejection It is the general practice of FPI to charge for larger higher priced replacement parts and issue credit once the r...

Страница 64: ...___________________________________ Printed in Canada FPI Regency Hampton Series are trademarks of FPI Fireplace Products International Ltd Regency fireplaces are designed with reliability and simplicity in mind In addition our internal Quality Assurance Team carefully inspects each unit thoroughly before it leaves our door Regency Fireplace Products is pleased to extend this Limited Lifetime Warr...

Отзывы: