24. Fire the unit to ensure correct operation and flame picture. Ensure the Split Valve and Flame Modulation works as described in the
operations section of this manual.
25. Check the pilot flame that it is the correct size and orientation. The pilot flame can be
adjusted with the adjustment provision on the front face of the valve. This is located just up
and to the left of the regulator motor. It is clearly marked on the valve. Adjusting the screw
in or out will raise or lower the pilot flame height. The correct pilot flame should resemble
Figure 60.
The ignition sequence should be as follows:
a) Press the ON button on the remote control.
b) The receiver should beep, to indicate the command has been received.
c) Within a 2-3 second of the beep, the ignitor should begin to spark. The ignitor will
spark at intervals of 1 second(s).
d) The main valve will open 4-6 seconds after the pilot is lit.
e) Within 4 seconds of the main valve opening, all of the burner ports should light and
remain burning.
26. To complete the LP conversion of this appliance, place the “LP Converted” sticker, supplied
with the LP conversion kit on the rating plate indicating that this unit has been converted
to operate on LP gas.
Figure 59: Pressure Test Points.
Figure 60: Relationship between ignitor and burner.
44
| HZ965/L965 Gas Fireplace
|
44
installation
Содержание Horizon HZ965E
Страница 52: ...SAFETY SCREEN INSTALLATION 52 HZ965 L965 Gas Fireplace 52 installation ...
Страница 66: ...66 HZ965 L965 Gas Fireplace 66 parts list ...
Страница 72: ......
Страница 73: ...HZ965 L965 Gas Fireplace 73 73 notes ...
Страница 74: ...74 HZ965 L965 Gas Fireplace 74 notes ...
Страница 75: ......