32
|
Regency Excalibur
®
P90E-11 Direct Vent Gas Stove
installation
Please note that all vertical
measurements are taken from
the base of the unit
excluding
risers or bottom stand-offs.
• Vent must be supported at offsets.
• Firestops are required at each floor level and whenever passing
through a wall.
• Maintain clearances to combustibles.
Note: Must use optional rigid pipe adaptor when using rigid
vent systems (Part # 510-994).
Rigid Pipe Venting Arrangements - Vertical
Terminations
The shaded area in the diagram shows all allowable combinations of
straight vertical and offset to vertical terminations, using two 90
o
elbow,
with
rigid pipe vent systems for Propane and Natural Gas.
The P90E-11 is approved for a maximum 40 ft. straight vertical, with
rigid
pipe 4" x 6-5/8" vent systems for Propane and Natural Gas, as per diagram.
The shaded area in the diagram show all allowable combinations of
straight vertical and offset to vertical terminations with
rigid pipe vent
systems for Propane and Natural Gas. Maximum two 45
o
elbows allowed.
• Vent must be supported at offsets
• Firestops are required at each floor level and whenever passing
through a wall.
• Maintain clearances to combustibles as listed in the "Clearances"
section.