City Series CV72E
|
9
dimensions
05/18/21
1
REGENCY GAS INSTALLATION CHECKLIST
Customer:
Date Installed:
Install Address:
Location of Fireplace:
Serial No:
Installer:
Model No:
Site Requirements
YES
NO
If applicable, are the insulation, vapour barrier, and drywall present if installed on an outside wall or chase?
Does the area have a solid continuous base to support the unit?
Will the area accommodate the size of the applliance and all clearances?
Are the gas and electrical roughed into the area where the unit is being installed?
In City & Grandview series cool wall applications, is the chase enclosure sealed to prevent heat from escaping? All hot air
from the unit must exit via the mandatory ventilation openings.
In City & Grandview applications, Is the chase enclosure vented with the mandatory heat ventilation openings? See manual
for details.
If applicable, is the masonry/factory built freplace in its original condition with no modifications?
If applicable, have the hearth requirements been met?
Unit Setup
YES
NO
If applicable, are the standoffs and top nailing flange extensions installed and at the correct depth to accommodate finishing
material? See manual for details.
If applicable, is the fireplace level and secured, meeting framing clearances? See manual for details.
If applicable, is the unit converted to top or rear vent per manual instructions, and the insulation discarded?
Venting
YES
NO
Are the venting components approved for the unit installed?
Does the venting configuration comply with venting diagrams?
Is venting installed and secured, and are clearances for the vent pipe and termination cap maintained?
If applicable, was a 1/4" rise maintained for every foot of horizontal run?
Was the termination installed and sealed?
Is the direct vent termination at the highest point in the vent assembly?
If applicable, are both chimney liners continuous from flue collars to termination?
Electrical and Wiring
YES
NO
Is the appliance connected to the household's 110/120v per local codes? Check local codes for receptacle placement.
Were the connections in the fireplace tested with a circuit tester?
Is the appliance properly grounded?
If applicable, is the supplied electrical/gang box affixed to the wall to facilitate the mounting of the receiver/battery box ?
Gas
YES
NO
Does the supply pressure meet the requirements shown on the rating plate?
Was a conversion performed?
Was a leak check performed and manifold pressures verified?
Is the shut-off valve installed and easily accessible to the customer?
This general checklist does not contain all pertinent installation details or specifics and does not supersede the guidelines in this manual. Your
Regency dealer/installer should use it in conjunction with manual instructions. Please follow all local codes and jurisdictions in authority.
Gas Installation Checklist
Содержание City CV72E-LP11
Страница 104: ...104 City Series CV72E ...
Страница 105: ...City Series CV72E 105 notes ...
Страница 106: ...106 City Series CV72E notes ...
Страница 107: ...City Series CV72E 107 ...