| City Series CC40EPV
installation
919-920
10.11.18
5
CV40EPV / CB40EPV / CC40EPV
Gas Power Vent Installation--wiring the power vent to the unit
1. Remove front access panel for ease of hooking up gas and electrical. Once
complete ensure that the access panel is reinstalled prior to any fi nishing.
The CC40LEPV/CC40REPV/CV40EPV all have 4 screws to re-
move access cover and the CB40 has 8 screws to remove cover.
See locations in diagrams below.
C CC40EPV
screw locations
CB40EPV screw locations
6-8in
Access panel removal
VFUHZV
$FFHVVSDQHOVFUHZV
2. Install strain relief and nut as shown below. Ensure that the nut is placed
on the inner portion of fi rebox with strain relief on the outer for ease of
securing BX cable.
Strain Relief Nut
Strain Relief
3. Bring the BX cable through the strain relief as shown below. An overall
length of approx. 22" (559mm) should be brought through.
4. BX cable -- bare approx. 6-8" of wire from the sheathing as shown below.
Strip ends of each individual wire.
5. Locate the 4 wires at the IFC control board wiring harness (blue,red,black
white wires) and strip ends of each wire if not already stripped.
Gas Power Vent Installation - Wiring the Power Vent to the Unit
Содержание City CC40LEPV-LP
Страница 84: ...84 City Series CC40EPV ...
Страница 85: ...City Series CC40EPV 85 notes ...
Страница 86: ...86 City Series CC40EPV notes ...
Страница 87: ......