Regency
®
CLASSIC™ C34E-11 Direct Vent Freestanding Gas Stove
|
29
installation
DV STOVE HORIZONTAL VENT KIT INSTALLATION
DV STOVE HORIZONTAL VENT KIT
DV 2 ft. Stove Vent Kit (Part # 946-116) and DV 4 ft. Stove Vent Kit (946-216) include all the parts needed to install the C34 with minimum horizontal
and vertical vent dimensions. For installations that require longer vertical and/or horizontal vents use the Dura-Vent system as shown in "Dura-
Vent Termination Kit" & "Dura-Vent Venting Components" section.
Qty.
Description
1.
1 Rigid Pipe Section (Kit # 946-116: 2 ft. (1.2m) length,
Kit # 946-216: 4 ft. (1.2m) length), 6-1/2" (165mm) inside diameter
2.
1 Flex Liner, compressed aluminium 2 ply liner, 4" (102mm) inside diameter
3.
4 spring spacers
4.
1 90 deg. Elbow
5.
1 Adjustable pipe section 13-1/2" to 24" (343mm x 610mm), 2 pieces
6.
1 Thimble Cover
7.
1 Wall Thimble (2 pcs.)
8.
1 Adapter
9.
1
AstroCap
Termination Cap
10
2 Trim Collar
11.
1 tube of Mill-Pac, high temperature sealant
12.
12 Screws, #8 x 1/2" Self tapping, Stainless Steel
13.
14 Screws, #8 x 1/2" Self tapping, Black
14.
4 Screws #8 x 1-1/2" Drill Point, Black
15.
4 Screws #8 x 1-1/2" Drill Point, Stainless Steel
17.
8 Wood screws #8 x 1"
Optional:
946-206 Vinyl Siding Standoff for
AstroCap
Note:
a) Liner sections should be continuous without any joints or seams.
b) This is an approved system, therefore components in this system
must not be substituted for any other manufacturer's products.
Review the following sequence of instructions
which are typical of most installations. The se-
quence may vary depending on wall thickness.
See "Locating Your Gas Stove" to "Exterior
Vent Terminal Locations" sections for vent
location and clearance dimensions.
1. Set the unit in its desired location. Check
to determine if wall studs will be in the way
of the venting system, adjust location until
all clearances are met and there are no
obstructions.
Note: A 1-1/2"(38mm) clearance around the
outer pipe must be maintained except
that only a 1" (25mm) clearance is
needed at the termination end.
IMPORTANT:
Do not locate termination hood where
excessive snow or ice buildup may oc-
cur. Be sure to check vent termination
area after snow falls, and clear to prevent
accidental blockage of venting system.
When using snow blowers, make sure
snow is not directed towards vent ter-
mination area.
2. Assemble a
trial fit
to determine the verti-
cal center-line for the vent termination.
a) Cut a 9-1/2" x 9-1/2" (241mm x 241
mm) square hole on both the interior
and exterior wall.
b) Install wall thimbles on both interior
and exterior wall with 4 wood screws
(#8 x 1") per thimble.
c) Attach the 2 piece adjustable pipe sec-
tion to the vent terminal and slide into
position from the exterior.
The larger
diameter end of the adjustable pipe
goes to the vent terminal.
d) Install the 90
o
elbow onto the adjust-
able pipe to determine the vertical
centerline of the starter collar on the
unit.
Note: if the centerline cannot be
met, the adjustable sections will
have to be cut.