![Regency Fireplace Products 686-927 Скачать руководство пользователя страница 68](http://html.mh-extra.com/html/regency-fireplace-products/686-927/686-927_owners-and-installation-manual_1433845068.webp)
68
|
City Series CB60EPV
installation
Gas Power Vent Installation Clearance Requirements
Inline Power Vent Terminations
920-210a
06.08.20
10
CV72EPV / CB72EPVCB40EPV/CC40EPV/CV40EPV
Inline Power Vent Vertical or Hortizontal Installation Instructions
Confined spaces (chase, closet, attic, behind a wall):
• 3” (76 mm) clearance is required on top of the power vent in a horizontal configuration (Diagram 2).
• 2” (51 mm) clearance is required on the sides and bottom in a horizontal configuration (Diagram 2).
• 1’ (0.3 m) clearance is required from the ends of the power vent in a horizontal configuration (Diagram 1).
• 2” (51 mm) clearance is required on sides in a vertical configuration (Diagram 2).
• 1’ clearance is required on ends in a vertical configuration (Diagram 1).
• A framed access hole with dimensions of 12” x 16” (305 mm x 406 mm) is required to access the access panel if the inline power vent is
placed behind a wall (Diagram 3).
• The access hole can be covered with an open-air louver cover which allows 50% open air.
• The power vent must be installed where it can be easily accessed for servicing. An access hole as noted below, or an attic space, would be
suitable.
Diagram 1
Diagram 2
Diagram 3
Diagram 4
Gas Power Vent Installation Clearance Requirements
Inline Power Vent Terminations
12 in
(305 mm)
12 in
(305 mm)
12 in
(305 mm)
16 in
(406 mm)
2 in
(51 mm)
2 in
(51 mm)
3 in
(76 mm)
Содержание 686-927
Страница 49: ...City Series CB60EPV 49 installation 2 x 4 shown Max 2 x 6 Typical Installations Flush Install Recessed Install ...
Страница 124: ...124 City Series CB60EPV notes ...
Страница 125: ...City Series CB60EPV 125 notes ...
Страница 126: ...126 City Series CB60EPV notes ...
Страница 127: ......