5.3. Commissioning TopCon TC.GXS systems
TopCon systems are only allowed to be put in operation after correct
installation and only by appropriately trained personnel.
Diagnosis and visualization for multi-unit systems with several built-in
TopCon TC.GXS devices, will be carried out by the TopCon TC.GXS
master device.
5.3.1.
Prior to switching on for the first time
Prior to switching on for the first time, the following points are to be
checked:
•
Does the information on the type plate match the mains
connection and load?
•
Are the mains connections wired correctly?
•
Loads connected with correct polarity?
•
In case of using sense: Is it connected correctly to load or DC
bars of TC.GXS device?
•
Control signals connected correctly?
•
External interlock/EMERGENCY STOP circuit / safety bus
wired?
5.3.2.
Parameterisation
The system and device parameterisation for the foreseen application is
taken into account in the factory settings. These cover the following
areas of the settings:
•
Multi-unit system
Internal system communication with device addressing.
•
Controller settings.
•
Limit values for the device protection, monitoring functions.
If you want to make changes to the system and its control parameters, it
is
imperative
you
perform
a
function
test
first.
For further information see section 6.2.5, Page 37.